Look up a published emission factor by what it is for — diesel, grid electricity in India or another country, cement, business travel — and see its gases, basis and the table it came from.

  • 10,277 factors from 7 public sources
  • Gases, GWP basis and the publisher's table reference on every row
  • Searches are not stored

626 factors for “coal”

Clear the search

ActivityDetailRegion · yearFactorGasesSource · reference
Svpl (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 63 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.5109 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.5109CEA v22.0 power stationsData sheet, station S_NO 472, 2024-25: 320.0 GWh net, 483,498 t CO2
Svpl (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 63 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.3113 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.3113CEA v22.0 power stationsData sheet, station S_NO 472, 2023-24: 284.7 GWh net, 373,379 t CO2
Talcher Stps (Orissa)Electricity — power stations (India)Thermal · Coal · 3000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.959187 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.959187CEA v22.0 power stationsData sheet, station S_NO 477, 2025-26: 19434.2 GWh net, 18,641,053 t CO2
Talcher Stps (Orissa)Electricity — power stations (India)Thermal · Coal · 3000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.955926 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.955926CEA v22.0 power stationsData sheet, station S_NO 477, 2024-25: 20004.9 GWh net, 19,123,180 t CO2
Talcher Stps (Orissa)Electricity — power stations (India)Thermal · Coal · 3000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.954211 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.954211CEA v22.0 power stationsData sheet, station S_NO 477, 2023-24: 21235.3 GWh net, 20,262,996 t CO2
Talwandi Sabo (Punjab)Electricity — power stations (India)Thermal · Coal · 1980 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.851307 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.851307CEA v22.0 power stationsData sheet, station S_NO 478, 2025-26: 9863.4 GWh net, 8,396,805 t CO2
Talwandi Sabo (Punjab)Electricity — power stations (India)Thermal · Coal · 1980 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.906725 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.906725CEA v22.0 power stationsData sheet, station S_NO 478, 2024-25: 10230.9 GWh net, 9,276,654 t CO2
Talwandi Sabo (Punjab)Electricity — power stations (India)Thermal · Coal · 1980 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.908228 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.908228CEA v22.0 power stationsData sheet, station S_NO 478, 2023-24: 10278.4 GWh net, 9,335,127 t CO2
Tamnar Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 2400 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.910431 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.910431CEA v22.0 power stationsData sheet, station S_NO 479, 2025-26: 17458.6 GWh net, 15,894,844 t CO2
Tamnar Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 2400 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.908858 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.908858CEA v22.0 power stationsData sheet, station S_NO 479, 2024-25: 18026.7 GWh net, 16,383,683 t CO2
Tamnar Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 2400 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.916317 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.916317CEA v22.0 power stationsData sheet, station S_NO 479, 2023-24: 16240.6 GWh net, 14,881,509 t CO2
Tanda (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1760 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.948724 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.948724CEA v22.0 power stationsData sheet, station S_NO 481, 2025-26: 8466.5 GWh net, 8,032,332 t CO2
Tanda (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1760 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.980354 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.980354CEA v22.0 power stationsData sheet, station S_NO 481, 2024-25: 9916.4 GWh net, 9,721,603 t CO2
Tanda (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1760 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.976654 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.976654CEA v22.0 power stationsData sheet, station S_NO 481, 2023-24: 9623.0 GWh net, 9,398,342 t CO2
Telangana Stpp (Telangana)Electricity — power stations (India)Thermal · Coal · 1600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.907266 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.907266CEA v22.0 power stationsData sheet, station S_NO 564, 2025-26: 8788.2 GWh net, 7,973,242 t CO2
Telangana Stpp (Telangana)Electricity — power stations (India)Thermal · Coal · 1600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.865122 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.865122CEA v22.0 power stationsData sheet, station S_NO 564, 2024-25: 9691.9 GWh net, 8,384,675 t CO2
Telangana Stpp (Telangana)Electricity — power stations (India)Thermal · Coal · 1600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.683892 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.683892CEA v22.0 power stationsData sheet, station S_NO 564, 2023-24: 3239.0 GWh net, 2,215,128 t CO2
Tenughat (Jharkhand)Electricity — power stations (India)Thermal · Coal · 420 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.069 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.069CEA v22.0 power stationsData sheet, station S_NO 492, 2025-26: 1892.1 GWh net, 2,022,731 t CO2
Tenughat (Jharkhand)Electricity — power stations (India)Thermal · Coal · 420 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0861 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0861CEA v22.0 power stationsData sheet, station S_NO 492, 2024-25: 2022.8 GWh net, 2,197,007 t CO2
Tenughat (Jharkhand)Electricity — power stations (India)Thermal · Coal · 420 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.077 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.077CEA v22.0 power stationsData sheet, station S_NO 492, 2023-24: 2142.4 GWh net, 2,307,300 t CO2
Thamminapatnam Tpp (Andhra Pradesh)Electricity — power stations (India)Thermal · Coal · 1000 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.161 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.161CEA v22.0 power stationsData sheet, station S_NO 493, 2025-26: 1650.3 GWh net, 1,916,045 t CO2
Thamminapatnam Tpp (Andhra Pradesh)Electricity — power stations (India)Thermal · Coal · 1000 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.3236 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.3236CEA v22.0 power stationsData sheet, station S_NO 493, 2024-25: 230.4 GWh net, 304,949 t CO2
Tirora Tpp (Maharashtra)Electricity — power stations (India)Thermal · Coal · 3300 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.900128 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.900128CEA v22.0 power stationsData sheet, station S_NO 497, 2025-26: 19656.5 GWh net, 17,693,358 t CO2
Tirora Tpp (Maharashtra)Electricity — power stations (India)Thermal · Coal · 3300 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.919242 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.919242CEA v22.0 power stationsData sheet, station S_NO 497, 2024-25: 20391.6 GWh net, 18,744,810 t CO2
Tirora Tpp (Maharashtra)Electricity — power stations (India)Thermal · Coal · 3300 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.901968 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.901968CEA v22.0 power stationsData sheet, station S_NO 497, 2023-24: 20096.1 GWh net, 18,126,010 t CO2
Torangallu Ext (Karnataka)Electricity — power stations (India)Thermal · Coal · 600 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.824834 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.824834CEA v22.0 power stationsData sheet, station S_NO 499, 2025-26: 3335.5 GWh net, 2,751,270 t CO2
Torangallu Ext (Karnataka)Electricity — power stations (India)Thermal · Coal · 600 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.906907 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.906907CEA v22.0 power stationsData sheet, station S_NO 499, 2024-25: 2603.0 GWh net, 2,360,661 t CO2
Torangallu Ext (Karnataka)Electricity — power stations (India)Thermal · Coal · 600 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.846793 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.846793CEA v22.0 power stationsData sheet, station S_NO 499, 2023-24: 2480.8 GWh net, 2,100,716 t CO2
Torangallu Imp (Karnataka)Electricity — power stations (India)Thermal · Coal · 260 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.524549 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.524549CEA v22.0 power stationsData sheet, station S_NO 500, 2025-26: 1883.8 GWh net, 988,170 t CO2
Torangallu Imp (Karnataka)Electricity — power stations (India)Thermal · Coal · 260 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.885526 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.885526CEA v22.0 power stationsData sheet, station S_NO 500, 2024-25: 1481.8 GWh net, 1,312,155 t CO2
Torangallu Imp (Karnataka)Electricity — power stations (India)Thermal · Coal · 260 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.725214 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.725214CEA v22.0 power stationsData sheet, station S_NO 500, 2023-24: 1586.3 GWh net, 1,150,392 t CO2
Torr Power Sab. (Gujarat)Electricity — power stations (India)Thermal · Coal · 362 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0033 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0033CEA v22.0 power stationsData sheet, station S_NO 501, 2025-26: 2254.1 GWh net, 2,261,568 t CO2
Torr Power Sab. (Gujarat)Electricity — power stations (India)Thermal · Coal · 362 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.98834 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.98834CEA v22.0 power stationsData sheet, station S_NO 501, 2024-25: 2358.2 GWh net, 2,330,654 t CO2
Torr Power Sab. (Gujarat)Electricity — power stations (India)Thermal · Coal · 362 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.986289 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.986289CEA v22.0 power stationsData sheet, station S_NO 501, 2023-24: 2654.1 GWh net, 2,617,730 t CO2
Trombay_Coal (Maharashtra)Electricity — power stations (India)Thermal · Coal · 750 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.952641 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.952641CEA v22.0 power stationsData sheet, station S_NO 504, 2025-26: 3457.0 GWh net, 3,293,282 t CO2
Trombay_Coal (Maharashtra)Electricity — power stations (India)Thermal · Coal · 750 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.9274 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.9274CEA v22.0 power stationsData sheet, station S_NO 504, 2024-25: 2981.6 GWh net, 2,765,167 t CO2
Trombay_Coal (Maharashtra)Electricity — power stations (India)Thermal · Coal · 750 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.930345 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.930345CEA v22.0 power stationsData sheet, station S_NO 504, 2023-24: 3894.0 GWh net, 3,622,763 t CO2
Tuticorin (Tamil Nadu)Electricity — power stations (India)Thermal · Coal · 1050 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0968 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0968CEA v22.0 power stationsData sheet, station S_NO 507, 2025-26: 3460.0 GWh net, 3,794,846 t CO2
Tuticorin (Tamil Nadu)Electricity — power stations (India)Thermal · Coal · 1050 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0896 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0896CEA v22.0 power stationsData sheet, station S_NO 507, 2024-25: 5389.8 GWh net, 5,872,752 t CO2
Tuticorin (Tamil Nadu)Electricity — power stations (India)Thermal · Coal · 1050 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0774 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0774CEA v22.0 power stationsData sheet, station S_NO 507, 2023-24: 5902.8 GWh net, 6,359,636 t CO2
Tuticorin Jv Stage-Iv (Tamil Nadu)Electricity — power stations (India)Thermal · Coal · 525 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.884326 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.884326CEA v22.0 power stationsData sheet, station S_NO 510, 2025-26: 2706.0 GWh net, 2,392,954 t CO2
Tuticorin Jv Stage-Iv (Tamil Nadu)Electricity — power stations (India)Thermal · Coal · 525 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.914712 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.914712CEA v22.0 power stationsData sheet, station S_NO 510, 2024-25: 2858.0 GWh net, 2,614,247 t CO2
Tuticorin Jv Stage-Iv (Tamil Nadu)Electricity — power stations (India)Thermal · Coal · 525 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.915717 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.915717CEA v22.0 power stationsData sheet, station S_NO 510, 2023-24: 2864.9 GWh net, 2,623,411 t CO2
Tuticorin Jv (Tamil Nadu)Electricity — power stations (India)Thermal · Coal · 1000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0426 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0426CEA v22.0 power stationsData sheet, station S_NO 509, 2025-26: 4889.9 GWh net, 5,098,096 t CO2
Tuticorin Jv (Tamil Nadu)Electricity — power stations (India)Thermal · Coal · 1000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.043 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.043CEA v22.0 power stationsData sheet, station S_NO 509, 2024-25: 4848.1 GWh net, 5,056,729 t CO2
Tuticorin Jv (Tamil Nadu)Electricity — power stations (India)Thermal · Coal · 1000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0342 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0342CEA v22.0 power stationsData sheet, station S_NO 509, 2023-24: 5068.1 GWh net, 5,241,594 t CO2
Uchpinda Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1440 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0626 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0626CEA v22.0 power stationsData sheet, station S_NO 513, 2025-26: 7460.2 GWh net, 7,926,946 t CO2
Uchpinda Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1440 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.062 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.062CEA v22.0 power stationsData sheet, station S_NO 513, 2024-25: 6897.1 GWh net, 7,325,048 t CO2
Uchpinda Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1440 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0446 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0446CEA v22.0 power stationsData sheet, station S_NO 513, 2023-24: 6634.8 GWh net, 6,930,908 t CO2
Udupi Tpp (Karnataka)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.88859 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.88859CEA v22.0 power stationsData sheet, station S_NO 514, 2025-26: 5094.9 GWh net, 4,527,245 t CO2

The sources in the library

Each source is loaded from the publisher's own files, with its edition and licence recorded. ESGTrack watches each publisher's page for a new edition.

SourcePublisherEditionFactorsBasisLicence
CO2 Baseline Database for the Indian Power SectorCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-01123CO2 onlyGovernment of India publication — free to use with attribution
GHG Emission Factors HubU.S. Environmental Protection Agency · publisher page2025 · 2025-01-15438AR5 (waste: AR4)U.S. Government work — public domain
2006 IPCC Guidelines for National Greenhouse Gas Inventories, Volume 2: EnergyIntergovernmental Panel on Climate Change · publisher page2006 (default factors) · 2006-04-01386AR5 and AR6 variantsIPCC — reproduced with attribution for inventory use
CO2 Baseline Database v22.0 — power-station dataCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-011,262CO2 onlyGovernment of India publication — free to use with attribution
Supply Chain Greenhouse Gas Emission Factors v1.3 (NAICS-6, spend-based)U.S. Environmental Protection Agency · publisher page1.3.0 · 2024-07-10985AR5U.S. Government work — public domain
Carbon intensity of electricity generation, by countryOur World in Data (Ember, Energy Institute) · publisher page2026 release · 2026-01-012,191Lifecycle (Ember)CC BY 4.0 — Our World in Data, based on Ember and the Energy Institute
2006 IPCC Guidelines and 2019 Refinement — industrial processes, waste and agriculture defaultsIntergovernmental Panel on Climate Change · publisher page2006 / 2019 (Tier 1 defaults) · 2019-05-014,892AR5 and AR6 variantsIPCC — reproduced with attribution; machine-readable values from bonsai-ipcc (MIT)

Not shown here: India Specific Road Transport Emission Factors (India GHG Program (WRI India, CII, TERI)), its publisher asks that its terms be checked before the values are republished. It is available inside the product.

How to read a factor

A factor only means something with its basis: the unit (per litre, per kilogram, per GJ on a net calorific value basis, per kWh), the gases it covers, the global warming potentials used to combine them, the region and the year. Two factors for "diesel" can legitimately differ by a few per cent because of the calorific value or density assumed. Record which one you used, and keep its reference.

For grid electricity in India, prefer the CEA's weighted average for the activity year if it is published before you report; otherwise the latest available, and say which. The Our World in Data figures are lifecycle intensities, useful for countries without a national factor but not a like-for-like substitute for one.

What this tool does not do

  • It shows bundled public sources only — not factors imported on an installation, not a company's private library, and not supplier-specific factors.
  • It does not choose a factor for you, convert units, or apply your fuel's measured calorific value — the product does those, with the decision recorded.
  • Publishers update their editions; the edition shown here is the one bundled, with its date.

Questions about the factor finder

Which sources are included?

The public sources bundled with ESGTrack: the IPCC 2006 Guidelines and the 2019 Refinement, the Central Electricity Authority's CO2 Baseline Database version 22.0 — both the grid averages and the power-station rates — the US EPA's GHG Emission Factors Hub (2025) and Supply Chain GHG Emission Factors v1.3, and Our World in Data's grid intensities for 212 countries. The India GHG Program's road transport factors are in the product but not shown here, because the programme asks that its terms are checked before its values are republished.

What do the columns mean?

CO₂, CH₄ and N₂O are kilograms of each gas per unit of activity; CO₂e combines them with the global warming potentials named in the GWP column (AR4, AR5, AR6, or "CO₂ only" where the publisher gives only carbon dioxide). The scope column is a hint about where the factor usually belongs; the reference is the publisher's table, so you can check the value at source.

Can I use these factors in my inventory?

They are published values, reproduced with their sources. Whether one fits your activity — the fuel, its calorific value, the year, the country, the basis — is a methodological decision for your inventory, which should record the factor used and why.

Factors chosen by date, with the decision recorded

ESGTrack applies the factor in force for each month, keeps your own site and company factors first, converts units, and logs every change with its source.