Skip to content

Emission factor finder

Look up a published emission factor by what it is for — diesel, grid electricity in India or another country, cement, business travel — and see its gases, basis and the table it came from.

  • 10,277 factors from 7 public sources
  • Gases, GWP basis and the publisher's table reference on every row
  • Searches are not stored

1,262 factors · CEA v22.0 power stations

Clear the search

ActivityDetailRegion · yearFactorGasesSource · reference
Agartala Gt (Tripura)Electricity — power stations (India)Thermal · Gas · 135 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.62554 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.62554CEA v22.0 power stationsData sheet, station S_NO 1, 2025-26: 530.3 GWh net, 331,724 t CO2
Agartala Gt (Tripura)Electricity — power stations (India)Thermal · Gas · 135 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.587902 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.587902CEA v22.0 power stationsData sheet, station S_NO 1, 2024-25: 524.2 GWh net, 308,193 t CO2
Agartala Gt (Tripura)Electricity — power stations (India)Thermal · Gas · 135 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.575144 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.575144CEA v22.0 power stationsData sheet, station S_NO 1, 2023-24: 616.5 GWh net, 354,571 t CO2
Akaltara Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.3412 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.3412CEA v22.0 power stationsData sheet, station S_NO 2, 2025-26: 8071.0 GWh net, 10,825,112 t CO2
Akaltara Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.4045 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.4045CEA v22.0 power stationsData sheet, station S_NO 2, 2024-25: 6717.4 GWh net, 9,434,520 t CO2
Akaltara Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.969307 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.969307CEA v22.0 power stationsData sheet, station S_NO 2, 2023-24: 9889.0 GWh net, 9,585,472 t CO2
Akrimota Lig (Gujarat)Electricity — power stations (India)Thermal · Lign · 250 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.8644 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.8644CEA v22.0 power stationsData sheet, station S_NO 3, 2025-26: 205.2 GWh net, 382,657 t CO2
Akrimota Lig (Gujarat)Electricity — power stations (India)Thermal · Lign · 250 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-252.2318 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 2.2318CEA v22.0 power stationsData sheet, station S_NO 3, 2024-25: 65.8 GWh net, 146,806 t CO2
Akrimota Lig (Gujarat)Electricity — power stations (India)Thermal · Lign · 250 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.966 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.966CEA v22.0 power stationsData sheet, station S_NO 3, 2023-24: 333.5 GWh net, 655,735 t CO2
Aliyar (Tamil Nadu)Electricity — power stations (India)Hydro · 60 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 4, 2025-26: 173.4 GWh net, 0 t CO2
Aliyar (Tamil Nadu)Electricity — power stations (India)Hydro · 60 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 4, 2024-25: 154.2 GWh net, 0 t CO2
Aliyar (Tamil Nadu)Electricity — power stations (India)Hydro · 60 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 4, 2023-24: 97.9 GWh net, 0 t CO2
Allain Duhangan (Himachal)Electricity — power stations (India)Hydro · 192 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 5, 2025-26: 601.3 GWh net, 0 t CO2
Allain Duhangan (Himachal)Electricity — power stations (India)Hydro · 192 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 5, 2024-25: 653.4 GWh net, 0 t CO2
Allain Duhangan (Himachal)Electricity — power stations (India)Hydro · 192 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 5, 2023-24: 584.7 GWh net, 0 t CO2
Almatti Dam (Karnataka)Electricity — power stations (India)Hydro · 290 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 6, 2025-26: 751.8 GWh net, 0 t CO2
Almatti Dam (Karnataka)Electricity — power stations (India)Hydro · 290 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 6, 2024-25: 621.6 GWh net, 0 t CO2
Almatti Dam (Karnataka)Electricity — power stations (India)Hydro · 290 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 6, 2023-24: 240.8 GWh net, 0 t CO2
Amar Kantak (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 210 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0157 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0157CEA v22.0 power stationsData sheet, station S_NO 7, 2025-26: 1570.1 GWh net, 1,594,776 t CO2
Amar Kantak (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 210 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0143 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0143CEA v22.0 power stationsData sheet, station S_NO 7, 2024-25: 1399.3 GWh net, 1,419,294 t CO2
Amar Kantak (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 210 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.999654 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.999654CEA v22.0 power stationsData sheet, station S_NO 7, 2023-24: 1638.0 GWh net, 1,637,479 t CO2
Amaravati Tpp (Maharashtra)Electricity — power stations (India)Thermal · Coal · 1350 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.966219 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.966219CEA v22.0 power stationsData sheet, station S_NO 8, 2025-26: 9019.3 GWh net, 8,714,665 t CO2
Amaravati Tpp (Maharashtra)Electricity — power stations (India)Thermal · Coal · 1350 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.962514 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.962514CEA v22.0 power stationsData sheet, station S_NO 8, 2024-25: 8605.5 GWh net, 8,282,887 t CO2
Amaravati Tpp (Maharashtra)Electricity — power stations (India)Thermal · Coal · 1350 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.1035 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.1035CEA v22.0 power stationsData sheet, station S_NO 8, 2023-24: 9004.0 GWh net, 9,935,744 t CO2
Anandpur Sahib St-I&Ii (Punjab)Electricity — power stations (India)Hydro · 134 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 9, 2025-26: 539.9 GWh net, 0 t CO2
Anandpur Sahib St-I&Ii (Punjab)Electricity — power stations (India)Hydro · 134 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 9, 2024-25: 483.7 GWh net, 0 t CO2
Anandpur Sahib St-I&Ii (Punjab)Electricity — power stations (India)Hydro · 134 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 9, 2023-24: 472.1 GWh net, 0 t CO2
Anapara "C" (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.929174 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.929174CEA v22.0 power stationsData sheet, station S_NO 10, 2025-26: 7795.7 GWh net, 7,243,580 t CO2
Anapara "C" (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.945266 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.945266CEA v22.0 power stationsData sheet, station S_NO 10, 2024-25: 7658.8 GWh net, 7,239,567 t CO2
Anapara "C" (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.943325 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.943325CEA v22.0 power stationsData sheet, station S_NO 10, 2023-24: 7667.6 GWh net, 7,233,012 t CO2
Anpara (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 2630 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.967333 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.967333CEA v22.0 power stationsData sheet, station S_NO 13, 2025-26: 16789.0 GWh net, 16,240,531 t CO2
Anpara (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 2630 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.970372 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.970372CEA v22.0 power stationsData sheet, station S_NO 13, 2024-25: 15654.8 GWh net, 15,190,953 t CO2
Anpara (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 2630 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.967089 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.967089CEA v22.0 power stationsData sheet, station S_NO 13, 2023-24: 15920.5 GWh net, 15,396,524 t CO2
Anta Gt (Rajasthan)Electricity — power stations (India)Thermal · Gas · 419.33 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.663094 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.663094CEA v22.0 power stationsData sheet, station S_NO 14, 2025-26: 230.3 GWh net, 152,703 t CO2
Anta Gt (Rajasthan)Electricity — power stations (India)Thermal · Gas · 419.33 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.582482 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.582482CEA v22.0 power stationsData sheet, station S_NO 14, 2024-25: 399.7 GWh net, 232,831 t CO2
Anta Gt (Rajasthan)Electricity — power stations (India)Thermal · Gas · 419.33 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.589161 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.589161CEA v22.0 power stationsData sheet, station S_NO 14, 2023-24: 336.0 GWh net, 197,952 t CO2
Anuppur Tpp (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 1250 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.974801 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.974801CEA v22.0 power stationsData sheet, station S_NO 15, 2025-26: 8018.0 GWh net, 7,815,984 t CO2
Anuppur Tpp (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 1250 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.973717 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.973717CEA v22.0 power stationsData sheet, station S_NO 15, 2024-25: 8016.4 GWh net, 7,805,751 t CO2
Anuppur Tpp (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 1250 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.963035 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.963035CEA v22.0 power stationsData sheet, station S_NO 15, 2023-24: 7940.1 GWh net, 7,646,544 t CO2
Auraiya Gt (Uttar Pradesh)Electricity — power stations (India)Thermal · Gas · 663.36 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.663592 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.663592CEA v22.0 power stationsData sheet, station S_NO 16, 2025-26: 332.9 GWh net, 220,934 t CO2
Auraiya Gt (Uttar Pradesh)Electricity — power stations (India)Thermal · Gas · 663.36 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.600241 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.600241CEA v22.0 power stationsData sheet, station S_NO 16, 2024-25: 524.9 GWh net, 315,069 t CO2
Auraiya Gt (Uttar Pradesh)Electricity — power stations (India)Thermal · Gas · 663.36 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.56063 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.56063CEA v22.0 power stationsData sheet, station S_NO 16, 2023-24: 667.4 GWh net, 374,170 t CO2
Avantha Bhandar Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 600 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.932789 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.932789CEA v22.0 power stationsData sheet, station S_NO 17, 2025-26: 3638.8 GWh net, 3,394,264 t CO2
Avantha Bhandar Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 600 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.928301 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.928301CEA v22.0 power stationsData sheet, station S_NO 17, 2024-25: 4146.1 GWh net, 3,848,827 t CO2
Avantha Bhandar Tpp (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 600 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.930621 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.930621CEA v22.0 power stationsData sheet, station S_NO 17, 2023-24: 3761.0 GWh net, 3,500,067 t CO2
Baglihar Hep (Jammu & Kashmir)Electricity — power stations (India)Hydro · 450 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 20, 2025-26: 2404.0 GWh net, 0 t CO2
Baglihar Hep (Jammu & Kashmir)Electricity — power stations (India)Hydro · 450 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 20, 2024-25: 2693.8 GWh net, 0 t CO2
Baglihar Hep (Jammu & Kashmir)Electricity — power stations (India)Hydro · 450 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 20, 2023-24: 2561.4 GWh net, 0 t CO2
Baglihar Hep-Ii (Jammu & Kashmir)Electricity — power stations (India)Hydro · 450 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 21, 2025-26: 1739.1 GWh net, 0 t CO2
Baglihar Hep-Ii (Jammu & Kashmir)Electricity — power stations (India)Hydro · 450 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 21, 2024-25: 1527.8 GWh net, 0 t CO2

The sources in the library

Each source is loaded from the publisher's own files, with its edition and licence recorded. ESGTrack watches each publisher's page for a new edition.

SourcePublisherEditionFactorsBasisLicence
CO2 Baseline Database for the Indian Power SectorCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-01123CO2 onlyGovernment of India publication — free to use with attribution
GHG Emission Factors HubU.S. Environmental Protection Agency · publisher page2025 · 2025-01-15438AR5 (waste: AR4)U.S. Government work — public domain
2006 IPCC Guidelines for National Greenhouse Gas Inventories, Volume 2: EnergyIntergovernmental Panel on Climate Change · publisher page2006 (default factors) · 2006-04-01386AR5 and AR6 variantsIPCC — reproduced with attribution for inventory use
CO2 Baseline Database v22.0 — power-station dataCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-011,262CO2 onlyGovernment of India publication — free to use with attribution
Supply Chain Greenhouse Gas Emission Factors v1.3 (NAICS-6, spend-based)U.S. Environmental Protection Agency · publisher page1.3.0 · 2024-07-10985AR5U.S. Government work — public domain
Carbon intensity of electricity generation, by countryOur World in Data (Ember, Energy Institute) · publisher page2026 release · 2026-01-012,191Lifecycle (Ember)CC BY 4.0 — Our World in Data, based on Ember and the Energy Institute
2006 IPCC Guidelines and 2019 Refinement — industrial processes, waste and agriculture defaultsIntergovernmental Panel on Climate Change · publisher page2006 / 2019 (Tier 1 defaults) · 2019-05-014,892AR5 and AR6 variantsIPCC — reproduced with attribution; machine-readable values from bonsai-ipcc (MIT)

Not shown here: India Specific Road Transport Emission Factors (India GHG Program (WRI India, CII, TERI)), its publisher asks that its terms be checked before the values are republished. It is available inside the product.

How to read a factor

A factor only means something with its basis: the unit (per litre, per kilogram, per GJ on a net calorific value basis, per kWh), the gases it covers, the global warming potentials used to combine them, the region and the year. Two factors for "diesel" can legitimately differ by a few per cent because of the calorific value or density assumed. Record which one you used, and keep its reference.

For grid electricity in India, prefer the CEA's weighted average for the activity year if it is published before you report; otherwise the latest available, and say which. The Our World in Data figures are lifecycle intensities, useful for countries without a national factor but not a like-for-like substitute for one.

What this tool does not do

  • It shows bundled public sources only — not factors imported on an installation, not a company's private library, and not supplier-specific factors.
  • It does not choose a factor for you, convert units, or apply your fuel's measured calorific value — the product does those, with the decision recorded.
  • Publishers update their editions; the edition shown here is the one bundled, with its date.

Questions about the factor finder

Which sources are included?

The public sources bundled with ESGTrack: the IPCC 2006 Guidelines and the 2019 Refinement, the Central Electricity Authority's CO2 Baseline Database version 22.0 — both the grid averages and the power-station rates — the US EPA's GHG Emission Factors Hub (2025) and Supply Chain GHG Emission Factors v1.3, and Our World in Data's grid intensities for 212 countries. The India GHG Program's road transport factors are in the product but not shown here, because the programme asks that its terms are checked before its values are republished.

What do the columns mean?

CO₂, CH₄ and N₂O are kilograms of each gas per unit of activity; CO₂e combines them with the global warming potentials named in the GWP column (AR4, AR5, AR6, or "CO₂ only" where the publisher gives only carbon dioxide). The scope column is a hint about where the factor usually belongs; the reference is the publisher's table, so you can check the value at source.

Can I use these factors in my inventory?

They are published values, reproduced with their sources. Whether one fits your activity — the fuel, its calorific value, the year, the country, the basis — is a methodological decision for your inventory, which should record the factor used and why.

Factors chosen by date, with the decision recorded

ESGTrack applies the factor in force for each month, keeps your own site and company factors first, converts units, and logs every change with its source.