1,262 factors · CEA v22.0 power stations

Clear the search

ActivityDetailRegion · yearFactorGasesSource · reference
Sewa-Ii (Jammu & Kashmir)Electricity — power stations (India)Hydro · 120 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 433, 2025-26: 474.4 GWh net, 0 t CO2
Sewa-Ii (Jammu & Kashmir)Electricity — power stations (India)Hydro · 120 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 433, 2024-25: 369.0 GWh net, 0 t CO2
Sewa-Ii (Jammu & Kashmir)Electricity — power stations (India)Hydro · 120 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 433, 2023-24: 549.1 GWh net, 0 t CO2
Shanan (Himachal)Electricity — power stations (India)Hydro · 110 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 436, 2025-26: 501.9 GWh net, 0 t CO2
Shanan (Himachal)Electricity — power stations (India)Hydro · 110 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 436, 2024-25: 510.1 GWh net, 0 t CO2
Shanan (Himachal)Electricity — power stations (India)Hydro · 110 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 436, 2023-24: 489.8 GWh net, 0 t CO2
Sharavathy (Karnataka)Electricity — power stations (India)Hydro · 1035 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 437, 2025-26: 5614.0 GWh net, 0 t CO2
Sharavathy (Karnataka)Electricity — power stations (India)Hydro · 1035 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 437, 2024-25: 4957.6 GWh net, 0 t CO2
Sharavathy (Karnataka)Electricity — power stations (India)Hydro · 1035 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 437, 2023-24: 3341.5 GWh net, 0 t CO2
Sharavathy Tail Race (Gerusupa) (Karnataka)Electricity — power stations (India)Hydro · 240 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 438, 2025-26: 642.2 GWh net, 0 t CO2
Sharavathy Tail Race (Gerusupa) (Karnataka)Electricity — power stations (India)Hydro · 240 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 438, 2024-25: 563.2 GWh net, 0 t CO2
Sharavathy Tail Race (Gerusupa) (Karnataka)Electricity — power stations (India)Hydro · 240 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 438, 2023-24: 346.1 GWh net, 0 t CO2
Shirpur (Maharashtra)Electricity — power stations (India)Thermal · Coal · 300 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0689 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0689CEA v22.0 power stationsData sheet, station S_NO 440, 2025-26: 1733.4 GWh net, 1,852,835 t CO2
Shirpur (Maharashtra)Electricity — power stations (India)Thermal · Coal · 300 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.961809 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.961809CEA v22.0 power stationsData sheet, station S_NO 440, 2024-25: 1345.7 GWh net, 1,294,313 t CO2
Shirpur (Maharashtra)Electricity — power stations (India)Thermal · Coal · 300 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.1455 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.1455CEA v22.0 power stationsData sheet, station S_NO 440, 2023-24: 310.8 GWh net, 355,965 t CO2
Sholayar (Kerala)Electricity — power stations (India)Hydro · 54 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 442, 2025-26: 274.1 GWh net, 0 t CO2
Sholayar (Kerala)Electricity — power stations (India)Hydro · 54 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 442, 2024-25: 251.0 GWh net, 0 t CO2
Sholayar (Kerala)Electricity — power stations (India)Hydro · 54 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 442, 2023-24: 248.5 GWh net, 0 t CO2
Sholayar I&Ii (Tamil Nadu)Electricity — power stations (India)Hydro · 84 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 443, 2025-26: 386.9 GWh net, 0 t CO2
Sholayar I&Ii (Tamil Nadu)Electricity — power stations (India)Hydro · 84 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 443, 2024-25: 272.1 GWh net, 0 t CO2
Shree Cement (Rajasthan)Electricity — power stations (India)Thermal · Coal · 344 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.077 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.077CEA v22.0 power stationsData sheet, station S_NO 560, 2025-26: 1262.5 GWh net, 1,359,749 t CO2
Shree Cement (Rajasthan)Electricity — power stations (India)Thermal · Coal · 344 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.974587 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.974587CEA v22.0 power stationsData sheet, station S_NO 560, 2024-25: 1306.4 GWh net, 1,273,202 t CO2
Shree Cement (Rajasthan)Electricity — power stations (India)Thermal · Coal · 344 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.04 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.04CEA v22.0 power stationsData sheet, station S_NO 560, 2023-24: 409.6 GWh net, 425,967 t CO2
Shri Singaji Malwa Tpp (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 2520 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.967093 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.967093CEA v22.0 power stationsData sheet, station S_NO 444, 2025-26: 12847.9 GWh net, 12,425,143 t CO2
Shri Singaji Malwa Tpp (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 2520 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.978819 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.978819CEA v22.0 power stationsData sheet, station S_NO 444, 2024-25: 14184.4 GWh net, 13,883,942 t CO2
Shri Singaji Malwa Tpp (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 2520 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.978821 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.978821CEA v22.0 power stationsData sheet, station S_NO 444, 2023-24: 14075.2 GWh net, 13,777,145 t CO2
Sikka Rep. (Gujarat)Electricity — power stations (India)Thermal · Coal · 500 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.1233 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.1233CEA v22.0 power stationsData sheet, station S_NO 445, 2025-26: 384.3 GWh net, 431,708 t CO2
Sikka Rep. (Gujarat)Electricity — power stations (India)Thermal · Coal · 500 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0525 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0525CEA v22.0 power stationsData sheet, station S_NO 445, 2024-25: 789.8 GWh net, 831,284 t CO2
Sikka Rep. (Gujarat)Electricity — power stations (India)Thermal · Coal · 500 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0664 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0664CEA v22.0 power stationsData sheet, station S_NO 445, 2023-24: 692.5 GWh net, 738,444 t CO2
Simhadri (Andhra Pradesh)Electricity — power stations (India)Thermal · Coal · 2000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0005 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0005CEA v22.0 power stationsData sheet, station S_NO 446, 2025-26: 10420.6 GWh net, 10,425,311 t CO2
Simhadri (Andhra Pradesh)Electricity — power stations (India)Thermal · Coal · 2000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.973448 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.973448CEA v22.0 power stationsData sheet, station S_NO 446, 2024-25: 11456.2 GWh net, 11,152,035 t CO2
Simhadri (Andhra Pradesh)Electricity — power stations (India)Thermal · Coal · 2000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.9697 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.9697CEA v22.0 power stationsData sheet, station S_NO 446, 2023-24: 10943.2 GWh net, 10,611,616 t CO2
Simhapuri Tpp (Andhra Pradesh)Electricity — power stations (India)Thermal · Coal · 600 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0018 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0018CEA v22.0 power stationsData sheet, station S_NO 447, 2025-26: 2491.3 GWh net, 2,495,725 t CO2
Simhapuri Tpp (Andhra Pradesh)Electricity — power stations (India)Thermal · Coal · 600 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0309 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0309CEA v22.0 power stationsData sheet, station S_NO 447, 2024-25: 2908.5 GWh net, 2,998,253 t CO2
Simhapuri Tpp (Andhra Pradesh)Electricity — power stations (India)Thermal · Coal · 600 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0366 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0366CEA v22.0 power stationsData sheet, station S_NO 447, 2023-24: 2764.7 GWh net, 2,865,968 t CO2
Singareni Tpp (Telangana)Electricity — power stations (India)Thermal · Coal · 1200 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.940678 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.940678CEA v22.0 power stationsData sheet, station S_NO 448, 2025-26: 7094.0 GWh net, 6,673,155 t CO2
Singareni Tpp (Telangana)Electricity — power stations (India)Thermal · Coal · 1200 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.92724 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.92724CEA v22.0 power stationsData sheet, station S_NO 448, 2024-25: 7501.1 GWh net, 6,955,301 t CO2
Singareni Tpp (Telangana)Electricity — power stations (India)Thermal · Coal · 1200 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.935521 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.935521CEA v22.0 power stationsData sheet, station S_NO 448, 2023-24: 8308.5 GWh net, 7,772,804 t CO2
Singoli Bhatwari (Uttarakhand)Electricity — power stations (India)Hydro · 99 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 449, 2025-26: 433.0 GWh net, 0 t CO2
Singoli Bhatwari (Uttarakhand)Electricity — power stations (India)Hydro · 99 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 449, 2024-25: 439.6 GWh net, 0 t CO2
Singoli Bhatwari (Uttarakhand)Electricity — power stations (India)Hydro · 99 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 449, 2023-24: 391.7 GWh net, 0 t CO2
Singrauli Stps (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 2000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.981332 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.981332CEA v22.0 power stationsData sheet, station S_NO 450, 2025-26: 12733.0 GWh net, 12,495,289 t CO2
Singrauli Stps (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 2000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.980657 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.980657CEA v22.0 power stationsData sheet, station S_NO 450, 2024-25: 14419.2 GWh net, 14,140,251 t CO2
Singrauli Stps (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 2000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.978126 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.978126CEA v22.0 power stationsData sheet, station S_NO 450, 2023-24: 14542.0 GWh net, 14,223,903 t CO2
Sipat Stps (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 2980 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.919985 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.919985CEA v22.0 power stationsData sheet, station S_NO 452, 2025-26: 20197.8 GWh net, 18,581,638 t CO2
Sipat Stps (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 2980 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.918485 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.918485CEA v22.0 power stationsData sheet, station S_NO 452, 2024-25: 21628.2 GWh net, 19,865,158 t CO2
Sipat Stps (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 2980 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.916582 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.916582CEA v22.0 power stationsData sheet, station S_NO 452, 2023-24: 21106.0 GWh net, 19,345,387 t CO2
Sivasamundrum (Karnataka)Electricity — power stations (India)Hydro · 42 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 454, 2025-26: 172.1 GWh net, 0 t CO2
Sivasamundrum (Karnataka)Electricity — power stations (India)Hydro · 42 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 454, 2024-25: 147.1 GWh net, 0 t CO2
Sivasamundrum (Karnataka)Electricity — power stations (India)Hydro · 42 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 454, 2023-24: 159.7 GWh net, 0 t CO2

The sources in the library

Each source is loaded from the publisher's own files, with its edition and licence recorded. ESGTrack watches each publisher's page for a new edition.

SourcePublisherEditionFactorsBasisLicence
CO2 Baseline Database for the Indian Power SectorCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-01123CO2 onlyGovernment of India publication — free to use with attribution
GHG Emission Factors HubU.S. Environmental Protection Agency · publisher page2025 · 2025-01-15438AR5 (waste: AR4)U.S. Government work — public domain
2006 IPCC Guidelines for National Greenhouse Gas Inventories, Volume 2: EnergyIntergovernmental Panel on Climate Change · publisher page2006 (default factors) · 2006-04-01386AR5 and AR6 variantsIPCC — reproduced with attribution for inventory use
CO2 Baseline Database v22.0 — power-station dataCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-011,262CO2 onlyGovernment of India publication — free to use with attribution
Supply Chain Greenhouse Gas Emission Factors v1.3 (NAICS-6, spend-based)U.S. Environmental Protection Agency · publisher page1.3.0 · 2024-07-10985AR5U.S. Government work — public domain
Carbon intensity of electricity generation, by countryOur World in Data (Ember, Energy Institute) · publisher page2026 release · 2026-01-012,191Lifecycle (Ember)CC BY 4.0 — Our World in Data, based on Ember and the Energy Institute
2006 IPCC Guidelines and 2019 Refinement — industrial processes, waste and agriculture defaultsIntergovernmental Panel on Climate Change · publisher page2006 / 2019 (Tier 1 defaults) · 2019-05-014,892AR5 and AR6 variantsIPCC — reproduced with attribution; machine-readable values from bonsai-ipcc (MIT)

Not shown here: India Specific Road Transport Emission Factors (India GHG Program (WRI India, CII, TERI)), its publisher asks that its terms be checked before the values are republished. It is available inside the product.

How to read a factor

A factor only means something with its basis: the unit (per litre, per kilogram, per GJ on a net calorific value basis, per kWh), the gases it covers, the global warming potentials used to combine them, the region and the year. Two factors for "diesel" can legitimately differ by a few per cent because of the calorific value or density assumed. Record which one you used, and keep its reference.

For grid electricity in India, prefer the CEA's weighted average for the activity year if it is published before you report; otherwise the latest available, and say which. The Our World in Data figures are lifecycle intensities, useful for countries without a national factor but not a like-for-like substitute for one.

What this tool does not do

  • It shows bundled public sources only — not factors imported on an installation, not a company's private library, and not supplier-specific factors.
  • It does not choose a factor for you, convert units, or apply your fuel's measured calorific value — the product does those, with the decision recorded.
  • Publishers update their editions; the edition shown here is the one bundled, with its date.

Questions about the factor finder

Which sources are included?

The public sources bundled with ESGTrack: the IPCC 2006 Guidelines and the 2019 Refinement, the Central Electricity Authority's CO2 Baseline Database version 22.0 — both the grid averages and the power-station rates — the US EPA's GHG Emission Factors Hub (2025) and Supply Chain GHG Emission Factors v1.3, and Our World in Data's grid intensities for 212 countries. The India GHG Program's road transport factors are in the product but not shown here, because the programme asks that its terms are checked before its values are republished.

What do the columns mean?

CO₂, CH₄ and N₂O are kilograms of each gas per unit of activity; CO₂e combines them with the global warming potentials named in the GWP column (AR4, AR5, AR6, or "CO₂ only" where the publisher gives only carbon dioxide). The scope column is a hint about where the factor usually belongs; the reference is the publisher's table, so you can check the value at source.

Can I use these factors in my inventory?

They are published values, reproduced with their sources. Whether one fits your activity — the fuel, its calorific value, the year, the country, the basis — is a methodological decision for your inventory, which should record the factor used and why.

Factors chosen by date, with the decision recorded

ESGTrack applies the factor in force for each month, keeps your own site and company factors first, converts units, and logs every change with its source.