Skip to content

Emission factor finder

Look up a published emission factor by what it is for — diesel, grid electricity in India or another country, cement, business travel — and see its gases, basis and the table it came from.

  • 10,277 factors from 7 public sources
  • Gases, GWP basis and the publisher's table reference on every row
  • Searches are not stored

626 factors for “coal”

Clear the search

ActivityDetailRegion · yearFactorGasesSource · reference
Khurja Stpp (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1320 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.879155 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.879155CEA v22.0 power stationsData sheet, station S_NO 571, 2024-25: 815.7 GWh net, 717,110 t CO2
Koderma (Jharkhand)Electricity — power stations (India)Thermal · Coal · 1000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.01 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.01CEA v22.0 power stationsData sheet, station S_NO 219, 2025-26: 5695.2 GWh net, 5,752,255 t CO2
Koderma (Jharkhand)Electricity — power stations (India)Thermal · Coal · 1000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.958674 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.958674CEA v22.0 power stationsData sheet, station S_NO 219, 2024-25: 6951.4 GWh net, 6,664,107 t CO2
Koderma (Jharkhand)Electricity — power stations (India)Thermal · Coal · 1000 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.98125 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.98125CEA v22.0 power stationsData sheet, station S_NO 219, 2023-24: 6695.0 GWh net, 6,569,498 t CO2
Kolaghat (West Bengal)Electricity — power stations (India)Thermal · Coal · 840 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.1533 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.1533CEA v22.0 power stationsData sheet, station S_NO 221, 2025-26: 4834.3 GWh net, 5,575,593 t CO2
Kolaghat (West Bengal)Electricity — power stations (India)Thermal · Coal · 840 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0576 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0576CEA v22.0 power stationsData sheet, station S_NO 221, 2024-25: 5254.6 GWh net, 5,557,321 t CO2
Kolaghat (West Bengal)Electricity — power stations (India)Thermal · Coal · 840 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.1625 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.1625CEA v22.0 power stationsData sheet, station S_NO 221, 2023-24: 4816.9 GWh net, 5,599,912 t CO2
Koradi (Maharashtra)Electricity — power stations (India)Thermal · Coal · 2190 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.933045 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.933045CEA v22.0 power stationsData sheet, station S_NO 226, 2025-26: 11855.2 GWh net, 11,061,403 t CO2
Koradi (Maharashtra)Electricity — power stations (India)Thermal · Coal · 2190 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.973498 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.973498CEA v22.0 power stationsData sheet, station S_NO 226, 2024-25: 12612.3 GWh net, 12,278,057 t CO2
Koradi (Maharashtra)Electricity — power stations (India)Thermal · Coal · 2190 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.991172 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.991172CEA v22.0 power stationsData sheet, station S_NO 226, 2023-24: 12177.8 GWh net, 12,070,273 t CO2
Korba Stps (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 2600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.960812 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.960812CEA v22.0 power stationsData sheet, station S_NO 227, 2025-26: 18679.5 GWh net, 17,947,477 t CO2
Korba Stps (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 2600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.944072 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.944072CEA v22.0 power stationsData sheet, station S_NO 227, 2024-25: 19404.9 GWh net, 18,319,602 t CO2
Korba Stps (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 2600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.945472 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.945472CEA v22.0 power stationsData sheet, station S_NO 227, 2023-24: 19265.9 GWh net, 18,215,356 t CO2
Korba-East (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 500 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.988478 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.988478CEA v22.0 power stationsData sheet, station S_NO 228, 2025-26: 3660.2 GWh net, 3,617,997 t CO2
Korba-East (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 500 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.986836 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.986836CEA v22.0 power stationsData sheet, station S_NO 228, 2024-25: 3423.2 GWh net, 3,378,155 t CO2
Korba-East (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 500 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.995399 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.995399CEA v22.0 power stationsData sheet, station S_NO 228, 2023-24: 3781.8 GWh net, 3,764,361 t CO2
Korba-West (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1340 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0881 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0881CEA v22.0 power stationsData sheet, station S_NO 229, 2025-26: 7790.9 GWh net, 8,477,647 t CO2
Korba-West (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1340 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0656 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0656CEA v22.0 power stationsData sheet, station S_NO 229, 2024-25: 7617.9 GWh net, 8,117,724 t CO2
Korba-West (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1340 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0629 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0629CEA v22.0 power stationsData sheet, station S_NO 229, 2023-24: 8845.2 GWh net, 9,401,252 t CO2
Kota (Rajasthan)Electricity — power stations (India)Thermal · Coal · 1240 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0817 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0817CEA v22.0 power stationsData sheet, station S_NO 231, 2025-26: 6277.4 GWh net, 6,790,547 t CO2
Kota (Rajasthan)Electricity — power stations (India)Thermal · Coal · 1240 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0703 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0703CEA v22.0 power stationsData sheet, station S_NO 231, 2024-25: 7767.5 GWh net, 8,313,546 t CO2
Kota (Rajasthan)Electricity — power stations (India)Thermal · Coal · 1240 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0991 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0991CEA v22.0 power stationsData sheet, station S_NO 231, 2023-24: 7504.5 GWh net, 8,248,229 t CO2
Kudgi (Karnataka)Electricity — power stations (India)Thermal · Coal · 2400 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.899528 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.899528CEA v22.0 power stationsData sheet, station S_NO 236, 2025-26: 9391.5 GWh net, 8,447,884 t CO2
Kudgi (Karnataka)Electricity — power stations (India)Thermal · Coal · 2400 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.892053 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.892053CEA v22.0 power stationsData sheet, station S_NO 236, 2024-25: 11321.4 GWh net, 10,099,312 t CO2
Kudgi (Karnataka)Electricity — power stations (India)Thermal · Coal · 2400 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.872081 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.872081CEA v22.0 power stationsData sheet, station S_NO 236, 2023-24: 11342.0 GWh net, 9,891,140 t CO2
Kundarki Tpp (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 90 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.1966 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.1966CEA v22.0 power stationsData sheet, station S_NO 240, 2025-26: 285.9 GWh net, 342,062 t CO2
Kundarki Tpp (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 90 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.2014 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.2014CEA v22.0 power stationsData sheet, station S_NO 240, 2024-25: 343.0 GWh net, 412,043 t CO2
Kundarki Tpp (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 90 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.2011 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.2011CEA v22.0 power stationsData sheet, station S_NO 240, 2023-24: 296.8 GWh net, 356,519 t CO2
K_Gudem New (Telangana)Electricity — power stations (India)Thermal · Coal · 1800 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.906079 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.906079CEA v22.0 power stationsData sheet, station S_NO 177, 2025-26: 8353.8 GWh net, 7,569,248 t CO2
K_Gudem New (Telangana)Electricity — power stations (India)Thermal · Coal · 1800 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.887475 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.887475CEA v22.0 power stationsData sheet, station S_NO 177, 2024-25: 10762.4 GWh net, 9,551,333 t CO2
K_Gudem New (Telangana)Electricity — power stations (India)Thermal · Coal · 1800 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.902118 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.902118CEA v22.0 power stationsData sheet, station S_NO 177, 2023-24: 12032.1 GWh net, 10,854,404 t CO2
K_Kheda Ii (Maharashtra)Electricity — power stations (India)Thermal · Coal · 1340 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0807 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0807CEA v22.0 power stationsData sheet, station S_NO 178, 2025-26: 7066.0 GWh net, 7,636,466 t CO2
K_Kheda Ii (Maharashtra)Electricity — power stations (India)Thermal · Coal · 1340 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0959 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0959CEA v22.0 power stationsData sheet, station S_NO 178, 2024-25: 7996.5 GWh net, 8,763,225 t CO2
K_Kheda Ii (Maharashtra)Electricity — power stations (India)Thermal · Coal · 1340 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0825 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0825CEA v22.0 power stationsData sheet, station S_NO 178, 2023-24: 7525.0 GWh net, 8,145,540 t CO2
Lalitpur Tpp (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1980 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.903712 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.903712CEA v22.0 power stationsData sheet, station S_NO 250, 2025-26: 11200.2 GWh net, 10,121,768 t CO2
Lalitpur Tpp (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1980 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.897707 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.897707CEA v22.0 power stationsData sheet, station S_NO 250, 2024-25: 11876.5 GWh net, 10,661,615 t CO2
Lalitpur Tpp (Uttar Pradesh)Electricity — power stations (India)Thermal · Coal · 1980 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.890942 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.890942CEA v22.0 power stationsData sheet, station S_NO 250, 2023-24: 11707.7 GWh net, 10,430,861 t CO2
Lara (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.869955 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.869955CEA v22.0 power stationsData sheet, station S_NO 248, 2025-26: 11497.8 GWh net, 10,002,598 t CO2
Lara (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.867712 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.867712CEA v22.0 power stationsData sheet, station S_NO 248, 2024-25: 11957.4 GWh net, 10,375,606 t CO2
Lara (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 1600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.878106 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.878106CEA v22.0 power stationsData sheet, station S_NO 248, 2023-24: 11062.2 GWh net, 9,713,765 t CO2
Maadurga Thermal Power Company Ltd. (Odisha)Electricity — power stations (India)Thermal · Coal · 60 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.4075 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.4075CEA v22.0 power stationsData sheet, station S_NO 572, 2025-26: 317.9 GWh net, 447,428 t CO2
Maadurga Thermal Power Company Ltd. (Odisha)Electricity — power stations (India)Thermal · Coal · 60 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.5527 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.5527CEA v22.0 power stationsData sheet, station S_NO 572, 2024-25: 175.8 GWh net, 272,965 t CO2
Mahadev Prasad Stpp (Jharkhand)Electricity — power stations (India)Thermal · Coal · 540 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0073 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0073CEA v22.0 power stationsData sheet, station S_NO 266, 2025-26: 3247.9 GWh net, 3,271,476 t CO2
Mahadev Prasad Stpp (Jharkhand)Electricity — power stations (India)Thermal · Coal · 540 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.989661 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.989661CEA v22.0 power stationsData sheet, station S_NO 266, 2024-25: 3541.5 GWh net, 3,504,890 t CO2
Mahadev Prasad Stpp (Jharkhand)Electricity — power stations (India)Thermal · Coal · 540 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0174 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0174CEA v22.0 power stationsData sheet, station S_NO 266, 2023-24: 3420.1 GWh net, 3,479,489 t CO2
Mahan Tpp (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.983386 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.983386CEA v22.0 power stationsData sheet, station S_NO 267, 2025-26: 7611.6 GWh net, 7,485,174 t CO2
Mahan Tpp (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.985949 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.985949CEA v22.0 power stationsData sheet, station S_NO 267, 2024-25: 7798.0 GWh net, 7,688,429 t CO2
Mahan Tpp (Madhya Pradesh)Electricity — power stations (India)Thermal · Coal · 1200 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0062 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0062CEA v22.0 power stationsData sheet, station S_NO 267, 2023-24: 6264.8 GWh net, 6,303,479 t CO2
Mahatma Gandhi Tpp (Haryana)Electricity — power stations (India)Thermal · Coal · 1320 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.849198 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.849198CEA v22.0 power stationsData sheet, station S_NO 268, 2025-26: 6631.2 GWh net, 5,631,202 t CO2
Mahatma Gandhi Tpp (Haryana)Electricity — power stations (India)Thermal · Coal · 1320 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.854641 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.854641CEA v22.0 power stationsData sheet, station S_NO 268, 2024-25: 7600.3 GWh net, 6,495,494 t CO2

The sources in the library

Each source is loaded from the publisher's own files, with its edition and licence recorded. ESGTrack watches each publisher's page for a new edition.

SourcePublisherEditionFactorsBasisLicence
CO2 Baseline Database for the Indian Power SectorCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-01123CO2 onlyGovernment of India publication — free to use with attribution
GHG Emission Factors HubU.S. Environmental Protection Agency · publisher page2025 · 2025-01-15438AR5 (waste: AR4)U.S. Government work — public domain
2006 IPCC Guidelines for National Greenhouse Gas Inventories, Volume 2: EnergyIntergovernmental Panel on Climate Change · publisher page2006 (default factors) · 2006-04-01386AR5 and AR6 variantsIPCC — reproduced with attribution for inventory use
CO2 Baseline Database v22.0 — power-station dataCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-011,262CO2 onlyGovernment of India publication — free to use with attribution
Supply Chain Greenhouse Gas Emission Factors v1.3 (NAICS-6, spend-based)U.S. Environmental Protection Agency · publisher page1.3.0 · 2024-07-10985AR5U.S. Government work — public domain
Carbon intensity of electricity generation, by countryOur World in Data (Ember, Energy Institute) · publisher page2026 release · 2026-01-012,191Lifecycle (Ember)CC BY 4.0 — Our World in Data, based on Ember and the Energy Institute
2006 IPCC Guidelines and 2019 Refinement — industrial processes, waste and agriculture defaultsIntergovernmental Panel on Climate Change · publisher page2006 / 2019 (Tier 1 defaults) · 2019-05-014,892AR5 and AR6 variantsIPCC — reproduced with attribution; machine-readable values from bonsai-ipcc (MIT)

Not shown here: India Specific Road Transport Emission Factors (India GHG Program (WRI India, CII, TERI)), its publisher asks that its terms be checked before the values are republished. It is available inside the product.

How to read a factor

A factor only means something with its basis: the unit (per litre, per kilogram, per GJ on a net calorific value basis, per kWh), the gases it covers, the global warming potentials used to combine them, the region and the year. Two factors for "diesel" can legitimately differ by a few per cent because of the calorific value or density assumed. Record which one you used, and keep its reference.

For grid electricity in India, prefer the CEA's weighted average for the activity year if it is published before you report; otherwise the latest available, and say which. The Our World in Data figures are lifecycle intensities, useful for countries without a national factor but not a like-for-like substitute for one.

What this tool does not do

  • It shows bundled public sources only — not factors imported on an installation, not a company's private library, and not supplier-specific factors.
  • It does not choose a factor for you, convert units, or apply your fuel's measured calorific value — the product does those, with the decision recorded.
  • Publishers update their editions; the edition shown here is the one bundled, with its date.

Questions about the factor finder

Which sources are included?

The public sources bundled with ESGTrack: the IPCC 2006 Guidelines and the 2019 Refinement, the Central Electricity Authority's CO2 Baseline Database version 22.0 — both the grid averages and the power-station rates — the US EPA's GHG Emission Factors Hub (2025) and Supply Chain GHG Emission Factors v1.3, and Our World in Data's grid intensities for 212 countries. The India GHG Program's road transport factors are in the product but not shown here, because the programme asks that its terms are checked before its values are republished.

What do the columns mean?

CO₂, CH₄ and N₂O are kilograms of each gas per unit of activity; CO₂e combines them with the global warming potentials named in the GWP column (AR4, AR5, AR6, or "CO₂ only" where the publisher gives only carbon dioxide). The scope column is a hint about where the factor usually belongs; the reference is the publisher's table, so you can check the value at source.

Can I use these factors in my inventory?

They are published values, reproduced with their sources. Whether one fits your activity — the fuel, its calorific value, the year, the country, the basis — is a methodological decision for your inventory, which should record the factor used and why.

Factors chosen by date, with the decision recorded

ESGTrack applies the factor in force for each month, keeps your own site and company factors first, converts units, and logs every change with its source.