Skip to content

Emission factor finder

Look up a published emission factor by what it is for — diesel, grid electricity in India or another country, cement, business travel — and see its gases, basis and the table it came from.

  • 10,277 factors from 7 public sources
  • Gases, GWP basis and the publisher's table reference on every row
  • Searches are not stored

1,262 factors · CEA v22.0 power stations

Clear the search

ActivityDetailRegion · yearFactorGasesSource · reference
Kahalgaon (Bihar)Electricity — power stations (India)Thermal · Coal · 2340 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.974253 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.974253CEA v22.0 power stationsData sheet, station S_NO 182, 2023-24: 15349.0 GWh net, 14,953,807 t CO2
Kaiga (Karnataka)Electricity — power stations (India)Nuclear · 880 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 183, 2025-26: 5143.4 GWh net, 0 t CO2
Kaiga (Karnataka)Electricity — power stations (India)Nuclear · 880 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 183, 2024-25: 6585.4 GWh net, 0 t CO2
Kaiga (Karnataka)Electricity — power stations (India)Nuclear · 880 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 183, 2023-24: 6714.9 GWh net, 0 t CO2
Kakatiya Tpp (Telangana)Electricity — power stations (India)Thermal · Coal · 1100 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.905198 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.905198CEA v22.0 power stationsData sheet, station S_NO 184, 2025-26: 6926.9 GWh net, 6,270,247 t CO2
Kakatiya Tpp (Telangana)Electricity — power stations (India)Thermal · Coal · 1100 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.947699 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.947699CEA v22.0 power stationsData sheet, station S_NO 184, 2024-25: 6033.0 GWh net, 5,717,443 t CO2
Kakatiya Tpp (Telangana)Electricity — power stations (India)Thermal · Coal · 1100 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.950482 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.950482CEA v22.0 power stationsData sheet, station S_NO 184, 2023-24: 7740.3 GWh net, 7,357,029 t CO2
Kakkad (Kerala)Electricity — power stations (India)Hydro · 50 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 185, 2025-26: 260.3 GWh net, 0 t CO2
Kakkad (Kerala)Electricity — power stations (India)Hydro · 50 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 185, 2024-25: 204.9 GWh net, 0 t CO2
Kakkad (Kerala)Electricity — power stations (India)Hydro · 50 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 185, 2023-24: 188.0 GWh net, 0 t CO2
Kakrapara (Gujarat)Electricity — power stations (India)Nuclear · 1840 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 186, 2025-26: 11433.0 GWh net, 0 t CO2
Kakrapara (Gujarat)Electricity — power stations (India)Nuclear · 1840 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 186, 2024-25: 11009.9 GWh net, 0 t CO2
Kakrapara (Gujarat)Electricity — power stations (India)Nuclear · 1840 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 186, 2023-24: 6781.3 GWh net, 0 t CO2
Kalinadi (Karnataka)Electricity — power stations (India)Hydro · 900 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 187, 2025-26: 3817.4 GWh net, 0 t CO2
Kalinadi (Karnataka)Electricity — power stations (India)Hydro · 900 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 187, 2024-25: 3848.9 GWh net, 0 t CO2
Kalinadi (Karnataka)Electricity — power stations (India)Hydro · 900 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 187, 2023-24: 2523.6 GWh net, 0 t CO2
Kalinadi Supa (Karnataka)Electricity — power stations (India)Hydro · 100 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 188, 2025-26: 719.3 GWh net, 0 t CO2
Kalinadi Supa (Karnataka)Electricity — power stations (India)Hydro · 100 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 188, 2024-25: 619.2 GWh net, 0 t CO2
Kalinadi Supa (Karnataka)Electricity — power stations (India)Hydro · 100 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 188, 2023-24: 423.6 GWh net, 0 t CO2
Kalisindh (Rajasthan)Electricity — power stations (India)Thermal · Coal · 1200 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0191 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0191CEA v22.0 power stationsData sheet, station S_NO 189, 2025-26: 6108.1 GWh net, 6,224,983 t CO2
Kalisindh (Rajasthan)Electricity — power stations (India)Thermal · Coal · 1200 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0077 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0077CEA v22.0 power stationsData sheet, station S_NO 189, 2024-25: 7069.4 GWh net, 7,123,792 t CO2
Kalisindh (Rajasthan)Electricity — power stations (India)Thermal · Coal · 1200 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.0454 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0454CEA v22.0 power stationsData sheet, station S_NO 189, 2023-24: 6581.0 GWh net, 6,879,470 t CO2
Kamalanga (Orissa)Electricity — power stations (India)Thermal · Coal · 1050 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.941797 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.941797CEA v22.0 power stationsData sheet, station S_NO 191, 2025-26: 7430.6 GWh net, 6,998,070 t CO2
Kamalanga (Orissa)Electricity — power stations (India)Thermal · Coal · 1050 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.943072 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.943072CEA v22.0 power stationsData sheet, station S_NO 191, 2024-25: 7405.1 GWh net, 6,983,493 t CO2
Kamalanga (Orissa)Electricity — power stations (India)Thermal · Coal · 1050 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.942193 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.942193CEA v22.0 power stationsData sheet, station S_NO 191, 2023-24: 7070.1 GWh net, 6,661,424 t CO2
Kameng (Arunachal)Electricity — power stations (India)Hydro · 600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 192, 2025-26: 2859.1 GWh net, 0 t CO2
Kameng (Arunachal)Electricity — power stations (India)Hydro · 600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 192, 2024-25: 2743.6 GWh net, 0 t CO2
Kameng (Arunachal)Electricity — power stations (India)Hydro · 600 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 192, 2023-24: 2638.9 GWh net, 0 t CO2
Karaikal (Puducherry)Electricity — power stations (India)Thermal · Gas · 32.5 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.641953 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.641953CEA v22.0 power stationsData sheet, station S_NO 194, 2025-26: 171.7 GWh net, 110,202 t CO2
Karaikal (Puducherry)Electricity — power stations (India)Thermal · Gas · 32.5 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.632493 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.632493CEA v22.0 power stationsData sheet, station S_NO 194, 2024-25: 187.5 GWh net, 118,599 t CO2
Karaikal (Puducherry)Electricity — power stations (India)Thermal · Gas · 32.5 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.565344 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.565344CEA v22.0 power stationsData sheet, station S_NO 194, 2023-24: 224.1 GWh net, 126,682 t CO2
Karbi Langpi (Assam)Electricity — power stations (India)Hydro · 100 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 195, 2025-26: 431.4 GWh net, 0 t CO2
Karbi Langpi (Assam)Electricity — power stations (India)Hydro · 100 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 195, 2024-25: 408.4 GWh net, 0 t CO2
Karbi Langpi (Assam)Electricity — power stations (India)Hydro · 100 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 195, 2023-24: 327.2 GWh net, 0 t CO2
Karcham Wangtoo (Himachal)Electricity — power stations (India)Hydro · 1045 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 196, 2025-26: 4669.1 GWh net, 0 t CO2
Karcham Wangtoo (Himachal)Electricity — power stations (India)Hydro · 1045 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 196, 2024-25: 4514.4 GWh net, 0 t CO2
Karcham Wangtoo (Himachal)Electricity — power stations (India)Hydro · 1045 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 196, 2023-24: 3767.5 GWh net, 0 t CO2
Kasaipalli (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 270 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-261.0869 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0869CEA v22.0 power stationsData sheet, station S_NO 199, 2025-26: 1377.9 GWh net, 1,497,623 t CO2
Kasaipalli (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 270 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-251.0913 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.0913CEA v22.0 power stationsData sheet, station S_NO 199, 2024-25: 1219.1 GWh net, 1,330,453 t CO2
Kasaipalli (Chattisgarh)Electricity — power stations (India)Thermal · Coal · 270 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-241.1141 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 1.1141CEA v22.0 power stationsData sheet, station S_NO 199, 2023-24: 1341.7 GWh net, 1,494,835 t CO2
Kashang Integrated (Himachal)Electricity — power stations (India)Hydro · 195 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 201, 2025-26: 210.3 GWh net, 0 t CO2
Kashang Integrated (Himachal)Electricity — power stations (India)Hydro · 195 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 201, 2024-25: 231.3 GWh net, 0 t CO2
Kashang Integrated (Himachal)Electricity — power stations (India)Hydro · 195 MW · StateStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0CEA v22.0 power stationsData sheet, station S_NO 201, 2023-24: 175.7 GWh net, 0 t CO2
Kashipur Ccpp (Uttarakhand)Electricity — power stations (India)Thermal · Gas · 439 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.423336 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.423336CEA v22.0 power stationsData sheet, station S_NO 202, 2025-26: 311.3 GWh net, 131,796 t CO2
Kashipur Ccpp (Uttarakhand)Electricity — power stations (India)Thermal · Gas · 439 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.415713 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.415713CEA v22.0 power stationsData sheet, station S_NO 202, 2024-25: 522.4 GWh net, 217,174 t CO2
Kashipur Ccpp (Uttarakhand)Electricity — power stations (India)Thermal · Gas · 439 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.418925 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.418925CEA v22.0 power stationsData sheet, station S_NO 202, 2023-24: 497.5 GWh net, 208,407 t CO2
Kathalguri Gt (Assam)Electricity — power stations (India)Thermal · Gas · 291 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.673992 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.673992CEA v22.0 power stationsData sheet, station S_NO 204, 2025-26: 1200.5 GWh net, 809,143 t CO2
Kathalguri Gt (Assam)Electricity — power stations (India)Thermal · Gas · 291 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2024-250.598835 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.598835CEA v22.0 power stationsData sheet, station S_NO 204, 2024-25: 1521.9 GWh net, 911,361 t CO2
Kathalguri Gt (Assam)Electricity — power stations (India)Thermal · Gas · 291 MW · CenterStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2023-240.572508 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.572508CEA v22.0 power stationsData sheet, station S_NO 204, 2023-24: 1646.7 GWh net, 942,725 t CO2
Kawai Tpp (Rajasthan)Electricity — power stations (India)Thermal · Coal · 1320 MW · PvtStation-specific CO2 per net kWh. Use it as a site factor where the site is supplied directly by this station (a direct line or captive generation). Power bought through the grid under a PPA belongs in market-based Scope 2 (energy attribute instruments) instead. Not a grid factorIndia · FY 2025-260.90715 kg CO₂e per kWhCO2 only · Scope 2 (direct supply)CO₂ 0.90715CEA v22.0 power stationsData sheet, station S_NO 205, 2025-26: 7791.2 GWh net, 7,067,786 t CO2

The sources in the library

Each source is loaded from the publisher's own files, with its edition and licence recorded. ESGTrack watches each publisher's page for a new edition.

SourcePublisherEditionFactorsBasisLicence
CO2 Baseline Database for the Indian Power SectorCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-01123CO2 onlyGovernment of India publication — free to use with attribution
GHG Emission Factors HubU.S. Environmental Protection Agency · publisher page2025 · 2025-01-15438AR5 (waste: AR4)U.S. Government work — public domain
2006 IPCC Guidelines for National Greenhouse Gas Inventories, Volume 2: EnergyIntergovernmental Panel on Climate Change · publisher page2006 (default factors) · 2006-04-01386AR5 and AR6 variantsIPCC — reproduced with attribution for inventory use
CO2 Baseline Database v22.0 — power-station dataCentral Electricity Authority, Government of India · publisher page22.0 · 2026-08-011,262CO2 onlyGovernment of India publication — free to use with attribution
Supply Chain Greenhouse Gas Emission Factors v1.3 (NAICS-6, spend-based)U.S. Environmental Protection Agency · publisher page1.3.0 · 2024-07-10985AR5U.S. Government work — public domain
Carbon intensity of electricity generation, by countryOur World in Data (Ember, Energy Institute) · publisher page2026 release · 2026-01-012,191Lifecycle (Ember)CC BY 4.0 — Our World in Data, based on Ember and the Energy Institute
2006 IPCC Guidelines and 2019 Refinement — industrial processes, waste and agriculture defaultsIntergovernmental Panel on Climate Change · publisher page2006 / 2019 (Tier 1 defaults) · 2019-05-014,892AR5 and AR6 variantsIPCC — reproduced with attribution; machine-readable values from bonsai-ipcc (MIT)

Not shown here: India Specific Road Transport Emission Factors (India GHG Program (WRI India, CII, TERI)), its publisher asks that its terms be checked before the values are republished. It is available inside the product.

How to read a factor

A factor only means something with its basis: the unit (per litre, per kilogram, per GJ on a net calorific value basis, per kWh), the gases it covers, the global warming potentials used to combine them, the region and the year. Two factors for "diesel" can legitimately differ by a few per cent because of the calorific value or density assumed. Record which one you used, and keep its reference.

For grid electricity in India, prefer the CEA's weighted average for the activity year if it is published before you report; otherwise the latest available, and say which. The Our World in Data figures are lifecycle intensities, useful for countries without a national factor but not a like-for-like substitute for one.

What this tool does not do

  • It shows bundled public sources only — not factors imported on an installation, not a company's private library, and not supplier-specific factors.
  • It does not choose a factor for you, convert units, or apply your fuel's measured calorific value — the product does those, with the decision recorded.
  • Publishers update their editions; the edition shown here is the one bundled, with its date.

Questions about the factor finder

Which sources are included?

The public sources bundled with ESGTrack: the IPCC 2006 Guidelines and the 2019 Refinement, the Central Electricity Authority's CO2 Baseline Database version 22.0 — both the grid averages and the power-station rates — the US EPA's GHG Emission Factors Hub (2025) and Supply Chain GHG Emission Factors v1.3, and Our World in Data's grid intensities for 212 countries. The India GHG Program's road transport factors are in the product but not shown here, because the programme asks that its terms are checked before its values are republished.

What do the columns mean?

CO₂, CH₄ and N₂O are kilograms of each gas per unit of activity; CO₂e combines them with the global warming potentials named in the GWP column (AR4, AR5, AR6, or "CO₂ only" where the publisher gives only carbon dioxide). The scope column is a hint about where the factor usually belongs; the reference is the publisher's table, so you can check the value at source.

Can I use these factors in my inventory?

They are published values, reproduced with their sources. Whether one fits your activity — the fuel, its calorific value, the year, the country, the basis — is a methodological decision for your inventory, which should record the factor used and why.

Factors chosen by date, with the decision recorded

ESGTrack applies the factor in force for each month, keeps your own site and company factors first, converts units, and logs every change with its source.