Skip to content

IFRS S1 and S2 (ISSB) · Lesson 9 of 10 · Module 4 — Capstone

Case study: Godavari Power Components' first IFRS S2 report

35 minFacts checked November 2026

In this lesson you will learn to

  • Apply IFRS S2 end to end for one company
  • Prepare risks, financial effects, metrics and GHG disclosures from the data
  • Decide which reliefs to use

Godavari Power Components Ltd is a fictional Indian maker of transformers and switchgear, listed in India, with a London-listed bond whose investors ask for IFRS S2 information. The figures are illustrative.

The data

  • Revenue ₹6,800 crore; total assets ₹9,500 crore; three plants (two in Gujarat on the coast, one in Madhya Pradesh).
  • Scope 1: 28,000 tCO₂e (including SF₆ leakage in testing of switchgear: 1.1 tonnes of SF₆). Scope 2: 62,000 MWh of grid electricity.
  • Plants on the coast: book value ₹2,800 crore; storm-surge risk rising.
  • Revenue from grid equipment for renewable energy projects: ₹2,040 crore.
  • Capital expenditure on new SF₆-free switchgear line and rooftop solar: ₹310 crore.
  • No internal carbon price; no climate link in executive pay.

Practice

Exercise 1: Task 1 — Risks and opportunities

Name two risks and one opportunity, with the cross-industry metric each relates to.

Show the model answer
  • Physical risk: storm surge and flooding at the two coastal plants — ₹2,800 crore = 29.5% of assets vulnerable to physical risk.
  • Transition risk: tightening rules on SF₆, a gas with a very high GWP used in switchgear — demand may shift to SF₆-free products; assets tied to SF₆ product lines are vulnerable to transition risk (quantify from the fixed asset register).
  • Opportunity: the grid build-out for renewable energy — ₹2,040 crore = 30% of revenue from climate-related opportunities.

Exercise 2: Task 2 — GHG

Calculate the SF₆ contribution to Scope 1 (AR6 GWP 24,300) and location-based Scope 2 (0.710 tCO₂/MWh, CEA version 2211). What share of Scope 1 is SF₆?

Show the model answer
  • SF₆: 1.1 t × 24,300 = 26,730 tCO₂e — 95% of Scope 1 (26,730 ÷ 28,000). The material source is not fuel but a test gas — a classic finding, and the key to the transition plan.
  • Scope 2 (location-based): 62,000 × 0.710 = 44,020 tCO₂e.

Exercise 3: Task 3 — Other metrics and reliefs

Complete the remaining cross-industry metrics and decide which reliefs Godavari should use in its first year.

Show the model answer
  • Capital deployment: ₹310 crore towards climate-related risks and opportunities (SF₆-free line, rooftop solar).
  • Internal carbon price: none used — say so, and whether one is planned.
  • Remuneration: climate not factored into executive pay — 0%; say so.
  • Reliefs: climate first (IFRS S2 only), no comparatives, and Scope 3 omitted if not ready — but category 11 (SF₆ leakage from sold switchgear over its life) may be material and should be planned for year 2.

Check your understanding

Choose an answer to see if you are right.

In the Godavari case, what is the largest source of Scope 1 emissions?

Show the answer

C. SF₆ leakage in switchgear testing 1.1 tonnes of SF₆ at a GWP of 24,300 is 26,730 tCO₂e — 95% of Scope 1.

Sources for this lesson

  1. CO2 Baseline Database for the Indian Power Sector, User Guide, Version 22.0 — Central Electricity Authority. August 2026; checked November 2026

Completing every lesson opens the exam and the certificate. Sign in with your e-mail to record your progress — no password and no account.

More: IFRS S1 and S2 practice questions · notes (PDF) · ESG glossary

Report it with the evidence behind every figure

ESGTrack prepares BRSR, CSRD and ISSB reports from approved data, with an audit trail an assurer can test.