In this lesson you will learn to
- Apply the whole course to one company's data
- Decide whether assurance is required and on what
- Calculate the BRSR Core environmental, people and finance indicators
- Review a draft for errors, as a reviewer or assurer would
- Write a material-issue disclosure for Section A
This case study brings the course together. Sahyadri Polymers Ltd is a fictional mid-sized manufacturer of plastic compounds; the figures are illustrative but realistic. Work through the five tasks before opening each model answer.
The company
- Listed on NSE and BSE. Ranked 420th by average market capitalisation for 1 July – 31 December 2025.
- Two plants — Chakan (Maharashtra) and Silvassa — and a head office in Mumbai. Standalone BRSR; no subsidiaries.
- FY 2025-26: revenue from operations ₹1,640 crore; other income ₹35 crore; production 2,46,000 tonnes.
The data
Energy and emissions (both plants together): grid electricity 18,400 MWh; open-access wind 3,500 MWh; rooftop solar 2,100 MWh; diesel 4,10,000 litres; natural gas 18,50,000 scm. Refrigerant top-ups: 120 kg of R-32 (illustrative GWP 675). Factors: diesel 36 MJ/l and 2.68 kg CO₂/l; natural gas 37.7 MJ/scm and 2.07 kg CO₂/scm; grid 0.710 tCO₂/MWh (CEA version 22, FY 2024-2511); PPP 22.4 rupees per international dollar.
Water: borewell 92,000 kL; municipal 60,000 kL; discharged after secondary treatment to the municipal sewer 41,000 kL.
Waste (tonnes):
| Category | Generated | Recovered | Disposed |
|---|---|---|---|
| A Plastic | 180 | Recycled 162 | Landfill 18 |
| B E-waste | 6 | Recycled 6 | — |
| C Bio-medical | 0.4 | — | Incineration 0.4 |
| D Construction and demolition | 420 | Re-used 300 | Landfill 120 |
| E Battery | 3 | Recycled 3 | — |
| G Other hazardous | 610 | Co-processing in cement kilns 214 (other recovery) | Incineration 96; landfill at a treatment, storage and disposal facility 300 |
| H Other non-hazardous | 2,020 | Recycled 1,210 | Landfill 810 |
People: person-hours worked — employees and workers 38,00,000, contract workers 18,50,000; lost time injuries 4 (one of them a contract worker); fatalities 0. Well-being ledger heads ₹9.6 crore (none paid by employees). Gross wages ₹176 crore, of which to women ₹21.4 crore. Women employees and workers: 96 at the start of the year, 104 at the end; POSH complaints 2, upheld 1.
Finance: trade payables ₹212 crore; cost of goods and services procured ₹1,180 crore, of which from MSMEs ₹386 crore.
Practice
Exercise 1: Task 1 — Is BRSR Core assessment or assurance required, and which route?
Decide whether Sahyadri needs BRSR Core assessment or assurance for FY 2025-26, and what it should consider when choosing between them.
Show the model answer
Yes. For FY 2025-26 the requirement covers the top 500, and Sahyadri is 420th. It may choose assessment (under the Industry Standards Forum's standards) or assurance (under ICAI's SSAE 3000 for this year). Considerations: what its investors and lenders expect (the largest companies have so far chosen reasonable assurance); the readiness of its data and controls; the provider's industry expertise; and independence — its current ESG consultant cannot be the provider. It records the provider and type in Section A items 14 and 15.
Exercise 2: Task 2 — The environmental attributes
Calculate: total energy and renewable share; energy intensity; Scope 1 (including refrigerant) and Scope 2; GHG intensity per million PPP dollars and per tonne; water consumption and intensity; total waste, waste intensity and the share recovered.
Show the model answer
- Revenue in PPP terms: ₹1,640 crore ÷ 22.4 = $732.1 million (revenue from operations only; other income excluded).
- Energy: electricity 86,400 GJ + diesel 14,760 GJ + natural gas 69,745 GJ = 1,70,905 GJ; renewable 20,160 GJ = 11.8%. Intensity 1,70,905 ÷ 732.1 = 233 GJ per million PPP dollars.
- Scope 1: diesel 1,098.8 t + natural gas 3,829.5 t + refrigerant 120 kg × 675 = 81.0 t → 5,009 tCO₂e.
- Scope 2: 18,400 × 0.710 = 13,064 tCO₂e.
- Scope 1 + 2 = 18,073 tCO₂e; intensity 18,073 ÷ 732.1 = 24.7 tCO₂e per million PPP dollars; 18,073 ÷ 2,46,000 = 0.073 tCO₂e per tonne of product.
- Water: withdrawal 1,52,000 kL; consumption 1,52,000 − 41,000 = 1,11,000 kL; intensity 1,11,000 ÷ 732.1 = 152 kL per million PPP dollars.
- Waste: total 3,239.4 t; intensity 3,239.4 ÷ 732.1 = 4.42 t per million PPP dollars; recovered 162 + 6 + 300 + 3 + 214 + 1,210 = 1,895 t (58.5%); disposed 18 + 0.4 + 120 + 96 + 300 + 810 = 1,344.4 t. Recovered + disposed = generated, as it should.
Exercise 3: Task 3 — The people and finance attributes
Calculate LTIFR, fatalities, well-being spending, gross wages to women, POSH complaints, MSME sourcing and days payable.
Show the model answer
- LTIFR = 4 × 10,00,000 ÷ (38,00,000 + 18,50,000) = 4 × 10,00,000 ÷ 56,50,000 = 0.71 (contract workers' hours and their injury included).
- Fatalities: 0.
- Well-being spending = 9.6 ÷ 1,640 = 0.59% of revenue.
- Gross wages to women = 21.4 ÷ 176 = 12.2%.
- POSH: average women = (96 + 104) ÷ 2 = 100; 2 ÷ 100 = 2.0%; 1 upheld.
- MSME sourcing = 386 ÷ 1,180 = 32.7%.
- Days payable = 212 × 365 ÷ 1,180 = 65.6 days.
Exercise 4: Task 4 — Review the draft
The first draft prepared by a junior colleague shows: Scope 2 13,800 tCO₂e; LTIFR 1.05; water consumption 1,52,000 kL; GHG intensity 24.2 tCO₂e per million PPP dollars; waste recovered 2,705 t; POSH 1.92% of women. Find the error behind each figure.
Show the model answer
- Scope 2 13,800 = 18,400 × 0.75 — an old grid factor was used. Use the latest CEA factor (0.710): 13,064.
- LTIFR 1.05 = 4 × 10,00,000 ÷ 38,00,000 — contract workers' hours were left out while their injury was counted. Correct: 0.71.
- Water consumption 1,52,000 — that is withdrawal; discharge was not subtracted. Correct: 1,11,000 kL.
- GHG intensity 24.2 — uses total income (₹1,675 crore including other income) as the denominator. Use revenue from operations: 24.7.
- Waste recovered 2,705 t — counts all non-hazardous waste sent to the vendor (2,020 t) as recycled, instead of the 1,210 t the vendor certified. Only certified recovery counts: 1,895 t.
- POSH 1.92% = 2 ÷ 104 — uses closing headcount. The Industry Standards use the average: 2.0%.
Exercise 5: Task 5 — A material issue for Section A item 26
Sahyadri's Chakan plant draws borewell water in an area under groundwater stress, and its customers in the packaging industry face plastic EPR obligations. Draft one row of item 26 for water: indicate risk or opportunity, rationale, approach, and financial implications.
Show the model answer
- Issue: Water availability at the Chakan plant.
- Risk or opportunity: Risk.
- Rationale: Chakan draws 92,000 kL a year from borewells in an area under groundwater stress; restrictions on extraction, or a dry monsoon, could limit production. Water is also a BRSR Core indicator and a growing customer question.
- Approach: Meter every borewell and the effluent treatment plant monthly; commission rainwater harvesting and tertiary treatment to recycle cooling-tower blowdown by FY 2027-28; set a target to cut water intensity per tonne of product by 20% by FY 2029-30 from FY 2025-26; review quarterly at the Risk Management Committee.
- Financial implications: Negative — potential lost production days and the cost of buying tanker water during shortages; capital expenditure on recycling (to be quantified in the project approval); positive — lower water cost per tonne once recycling is in place.
Check your understanding
Choose an answer to see if you are right.
Sources for this lesson
- CO2 Baseline Database for the Indian Power Sector, User Guide, Version 22.0 — Central Electricity Authority. August 2026; checked November 2026
Completing every lesson opens the exam and the certificate. Sign in with your e-mail to record your progress — no password and no account.
More: BRSR practice questions · notes (PDF) · ESG glossary