BRSR and BRSR Core · Lesson 15 of 18 · Module 4 — Doing the work

The government filings behind the BRSR data

60 minFacts checked November 2026

In this lesson you will learn to

  • Name the statutory filings that hold the same data as the BRSR — CSR, consents, the Environmental Statement, hazardous waste returns, EPR returns, PAT and CCTS, POSH and labour
  • State each filing's form, authority and due date, and the penalty for missing it
  • Reconcile the BRSR with these filings, including where their periods differ

Most of the figures in a BRSR have already been reported to a government authority — CSR spending to the Registrar of Companies, water and waste to the State Pollution Control Board, plastic to the CPCB, energy to the Bureau of Energy Efficiency, harassment complaints to the District Officer. An assurer, an analyst or a regulator can compare them. A BRSR that disagrees with these filings is the first thing they find.

This lesson walks through the filings, what each one holds, its due date and the penalty for missing it. The law changes often: the dates and amounts here were checked in November 2026 against the sources cited; check the current text before relying on one.

Corporate social responsibility (Section A item 22, Principle 8)

Who. A company with, in the preceding financial year, a net worth of ₹500 crore or more, a turnover of ₹1,000 crore or more, or a net profit of ₹5 crore or more must spend at least 2% of its average net profit of the three preceding years on CSR, under section 135 of the Companies Act18. It needs a CSR committee of the board unless the amount to be spent is ₹50 lakh or less, in which case the board performs the committee's functions18.

Implementing agencies. Since 1 April 2021, any entity that carries out CSR projects for a company must be registered with the Ministry of Corporate Affairs through Form CSR-1, which gives it a CSR registration number1718. Check the number before you pay an NGO.

Unspent money — the step most often missed:

SituationWhat the law requiresDeadline
Unspent amount relates to an ongoing projectTransfer to a special bank account, the Unspent CSR Account, and spend it within three financial years20Within 30 days of the end of the financial year
Still unspent after those three yearsTransfer to a fund in Schedule VII (for example, the PM CARES Fund or the PM's National Relief Fund)20Within 30 days of the end of the third year
Unspent amount not relating to an ongoing projectTransfer to a Schedule VII fund18Within six months of the end of the financial year

Penalty. Failing to spend or transfer as required makes the company liable to a penalty of twice the amount required to be transferred, or ₹1 crore, whichever is less, and every officer in default to one-tenth of that amount, or ₹2 lakh, whichever is less2018.

Reporting. The annual report on CSR activities, in the format in Annexure II to the CSR Rules, goes in the board's report17. Companies covered by section 135 also file Form CSR-2 with the Registrar of Companies — introduced from FY 2020-21 as an addendum to the annual accounts filing (Form AOC-4)18, and filed as a separate form after AOC-4 since FY 2022-2319. A company with an average CSR obligation of ₹10 crore or more must have an independent impact assessment of each project of ₹1 crore or more completed at least a year earlier17.

What Form CSR-2 asks. The main fields of Form CSR-2, filled in for Konkan Organics' FY 2025-26 — the same figures as the CSR exercise below. MCA has revised the e-form since it was introduced, so the fields on the portal may be arranged differently; the substance is the same.

Form walkthrough

Companies (Accounts) Rules, 2014, rule 12(1B); filed with the Registrar of Companies after Form AOC-4.

Form CSR-2 — Report on corporate social responsibility, FY 2025-26 (main fields)

The company and the year

1 CIN, name and registered office

The company's CIN — name, registered office and e-mail fill in from the MCA records

Check the pre-filled details are current before you start.

2 Financial year

1 April 2025 to 31 March 2026

The year the report covers.

3 Criterion under section 135(1) that made CSR apply

Turnover of ₹1,000 crore or more (₹1,120 crore) and net profit of ₹5 crore or more (₹196 crore), in FY 2024-25

Tested on the preceding year's audited figures: net worth ₹500 crore, turnover ₹1,000 crore or net profit ₹5 crore.

Watch out: Testing the current year. Applicability comes from the preceding year.

Governance

4(a) CSR committee: meetings held and attendance

3 meetings; every member attended all three

From the minutes. If the obligation is ₹50 lakh or less, the board does the committee's work and this says so.

Watch out: Attendance that does not match the minutes.

4(b) Website links: committee composition, CSR policy, projects approved by the board

Links to the CSR page of the company's website

Required if the company has a website. Open each link before filing.

Watch out: Links that are dead on the day of filing.

4(c) Impact assessment

Not applicable — the average CSR obligation is below ₹10 crore

Required for companies with an average obligation of ₹10 crore or more, for projects of ₹1 crore or more completed at least a year earlier.

4(d) Set-off of excess spending from the previous three years

Nil

Excess spent in a year can be set off over the next three, with a board resolution.

The obligation

5 Average net profit under section 135(5)

₹180 crore (₹162 crore, ₹174 crore and ₹204 crore in the three preceding years)

Net profit calculated under section 198, not profit before tax from the accounts.

Watch out: Using the profit-and-loss figure without the section 198 adjustments.

6 Two per cent of average net profit, less set-off, plus surplus

₹3.60 crore — no surplus, no set-off

The amount to spend this year.

What was spent

7(a)–(e) Amount spent: ongoing projects, other projects, administrative overheads, impact assessment, total

Ongoing ₹1.10 crore; other projects ₹1.66 crore; overheads ₹0.14 crore; impact assessment nil; total ₹2.90 crore

Project by project, with the Schedule VII item, location, implementing agency and its CSR-1 registration number. Overheads may not exceed 5% of total CSR expenditure.

Watch out: An agency without a CSR-1 number; overheads above 5% (here 4.8%).

7(f)–(h) Unspent amount, and how much goes to the Unspent CSR Account and to a Schedule VII fund

Unspent ₹0.70 crore: ₹0.50 crore (ongoing school building) to the Unspent CSR Account; ₹0.20 crore to a Schedule VII fund

Ongoing-project money to the Unspent CSR Account; the rest to a Schedule VII fund.

8 Transfers made: amount and date

₹0.50 crore to the Unspent CSR Account on 28 April 2026; ₹0.20 crore to the PM's National Relief Fund on 18 September 2026

Within 30 days of the year-end for the Unspent CSR Account; within six months for a Schedule VII fund. Attach the bank evidence to your file.

Watch out: A late transfer — the penalty under section 135(7) applies.

9 Reasons for not spending the full amount

The school building, a three-year project, is behind schedule; one programme did not start

Required when there is an unspent amount. Say what will happen to the money.

12 Capital assets created or acquired through CSR

Yes — a school building, owned by the Zilla Parishad

Each asset, its address, the date, the amount and who owns it — a public authority or an eligible entity, not the company.

Watch out: Assets left in the company's name.

Redrawn from the structure of e-Form CSR-2 as explained by the Institute of Company Secretaries of India33; filing rules1819. The entries are an illustrative example. Check the current form with the authority before you file. Form CSR-2: due date, penalty and questions.

Consents to establish and operate

A factory needs the State Pollution Control Board's consent to establish (CTE) before it is built and consent to operate (CTO) before it runs, under section 25 of the Water Act and section 21 of the Air Act. Consents carry conditions — discharge limits, stack limits, monitoring — and an expiry date. The BRSR's Principle 6 asks whether the company complies with the applicable environmental laws and to list any non-compliance10.

Penalties were reworked in 2023 and 2024:

  • Water Act. Failing to comply with section 25 or 26 (the consent provisions) remains a criminal offence: imprisonment of one and a half to six years and a fine, with more for continuing failure23. Other contraventions attract penalties decided by an adjudicating officer, with an appeal to the National Green Tribunal within 60 days on depositing 10% of the penalty; a penalty not paid within 90 days can lead to imprisonment of up to three years23.
  • Air Act. Establishing or operating without consent (section 21) remains punishable with imprisonment. Breaching emission standards (section 22) now attracts a penalty of ₹10,000 to ₹15 lakh for each contravention, plus ₹10,000 a day while it continues, decided by an adjudicating officer22.
  • Environment (Protection) Act. Contravening the Act or its rules — the waste rules, the EPR rules — attracts a penalty of ₹10,000 to ₹15 lakh for each contravention, plus ₹10,000 a day while it continues, credited to an Environmental Protection Fund22.

Keep a register of every consent and authorisation with its expiry date, and apply for renewal in time — for a hazardous waste authorisation, three months before expiry24.

The Environmental Statement: Form V

Every unit that needs consent under the Water Act or the Air Act, or an authorisation under the hazardous waste rules, must submit an environmental statement in Form V to the State Pollution Control Board for the financial year ending 31 March, by 30 September each year (rule 14 of the Environment (Protection) Rules, 1986)21.

Form V reports water and raw material consumption, pollutants discharged against the consent limits, hazardous and solid waste, and pollution control measures. It is the closest government filing to the BRSR's Principle 6: water withdrawal and consumption, hazardous waste and air emissions should agree with it, site by site.

What Form V looks like. Below is Form V redrawn field by field, filled in for Konkan Organics' plant at Lote for FY 2025-26 — the same plant as the exercises at the end of this lesson. Switch to the blank form to see what you start with, and read the note beside each field for where the entry comes from.

Form walkthrough

Environment (Protection) Rules, 1986 — rule 14. Submit to the State Pollution Control Board by 30 September.

Form V — Environmental statement for the financial year ending 31 March 2026

Part A — The unit

(i) Name and address of the owner or occupier of the industry, operation or process

Konkan Organics Ltd (occupier: R. Desai, Plant Head), Plot D-12, MIDC Lote Parshuram, Ratnagiri, Maharashtra

The occupier as named in the consent order — the person who controls the unit — and the plant's address.

Watch out: The head-office address. The Board files statements by unit; a statement it cannot match to a consent may be treated as not filed.

(ii) Industry category: primary (STC code) and secondary (SIC code)

Red category; manufacture of organic chemicals (as in the consent order)

Enter the codes or category your Board's form asks for, exactly as in the consent order.

Watch out: A different description from the consent. Inspectors compare the two.

(iii) Production capacity (units)

Ethyl acetate: 30,000 tonnes a year (consented capacity)

The capacity the consent allows, in its units. Actual production is reported later, per unit of product.

Watch out: Entering actual production here.

(iv) Year of establishment

1998

From the factory licence or the first consent.

(v) Date of the last environmental statement submitted

24 September 2025 (FY 2024-25)

The date on last year's acknowledgement. Keep the acknowledgement with this year's copy.

Watch out: Leaving it blank because last year's was late. Give the actual date.

Part B — Water and raw material consumption

(i) Water consumption (m³ a day)

Purposem³ a day
Process260
Cooling110
Domestic45

Average daily use by purpose, from the meters. Check it against the year: 415 m³ a day × 365 days = 1,51,475 m³, which agrees with the BRSR's water withdrawal of 1,52,000 kL.

Watch out: Figures that do not reconcile with the annual withdrawal in the BRSR. The two are compared.

Process water consumption per unit of product output

Name of productDuring the previous financial yearDuring the current financial year
Ethyl acetate (m³ per tonne)3.63.4

Process water ÷ production, for each main product, this year and last. A fall is worth explaining in Part G.

(ii) Raw material consumption per unit of output

Name of raw materialName of productPrevious financial yearCurrent financial year
Acetic acidEthyl acetate0.70 t per t0.69 t per t
EthanolEthyl acetate0.53 t per t0.53 t per t

From the production and stores records. Codes may replace raw material names only where naming them would breach a contract.

Watch out: Units that change from year to year — keep tonnes per tonne.

Part C — Pollution discharged to the environment (per unit of output)

Pollutants discharged: quantity, concentration and variation from the prescribed standards, with reasons

PollutantQuantity discharged (mass a day)Concentration (mass per volume)Variation from prescribed standards, with reasons
(a) Water — COD9.2 kg a day82 mg/lWithin the consent limit of 250 mg/l
(a) Water — BOD2.7 kg a day24 mg/lWithin the consent limit of 30 mg/l
(b) Air — particulate matter, boiler stack1.6 kg a day38 mg/Nm³Within the consent limit of 50 mg/Nm³

From the monitoring reports required by the consent — online monitors or a recognised laboratory. Quantity = concentration × flow: 82 mg/l × 112 m³ a day = 9.2 kg of COD a day.

Watch out: Averaging away exceedances. Report any breach here, with its reason; it is also a non-compliance the BRSR's Principle 6 asks about.

Part D — Hazardous wastes

Total quantity (kg): from process, and from pollution control facilities

Hazardous wastePrevious financial yearCurrent financial year
(a) From process (distillation residue)3,96,000 kg4,18,000 kg
(b) From pollution control facilities (ETP sludge)18,000 kg20,000 kg

The same figures as the hazardous waste annual return (Form 4) and the Form 3 records. Form V asks in kilograms; the BRSR in tonnes.

Watch out: Different totals in Form V, Form 4 and the BRSR. 4,38,000 kg here must be 438 t everywhere.

Part E — Solid wastes

Total quantity, and what happened to it

Solid wastePrevious financial yearCurrent financial year
(a) From process1,250 t1,310 t
(b) From pollution control facility00
(c)(1) Quantity recycled or re-used within the unit00
(c)(2) Sold1,180 t1,250 t
(c)(3) Disposed70 t60 t

Non-hazardous solid waste from the process and from pollution control, and its disposition.

Watch out: Counting waste "sent to a vendor" as recycled without the vendor's certificate.

Parts F to I — Narrative

F Characteristics of the hazardous and solid wastes (composition and quantity) and the disposal practice for each

Distillation residue: organic, high calorific value; co-processed in an authorised cement kiln. ETP sludge: inorganic salts; sent to the common hazardous waste treatment, storage and disposal facility.

Composition, quantity and route for each waste stream, naming the authorised receiver.

G Impact of pollution abatement measures on the conservation of natural resources and on the cost of production

Condensate recovery and reuse of cooling-tower blowdown cut process water from 3.6 to 3.4 m³ per tonne, saving about ₹18 lakh a year.

Measures taken this year and what they saved — in resources and in money.

H Additional measures and investment proposals for environmental protection, including the abatement and prevention of pollution

A multiple-effect evaporator, planned for FY 2026-27 at an estimated ₹4.2 crore, towards zero liquid discharge.

Plans with an amount and a year.

I Any other particulars for improving the quality of the environment

Rainwater harvesting from roofs of 6,000 m²; 1,200 trees planted in the green belt.

Anything else relevant.

Redrawn from Form V as published by the Odisha State Pollution Control Board31, under rule 1421. The entries are an illustrative example. Check the current form with the authority before you file. Form V: due date, penalty and questions.

Hazardous waste: authorisation, records and the annual return

Under the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 201624:

FormWhat it isWhen
Form 1Application for authorisationBefore generating, storing or handling hazardous waste; renewal three months before expiry
Form 2The authorisation, granted by the SPCBValid for five years
Form 3Records of hazardous waste generated, stored, sent and disposed ofKept up to date continuously
Form 4Annual return to the SPCBBy 30 June following the financial year
Form 10Manifest — the seven-copy document that travels with each consignment to the treatment, storage and disposal facilityEvery consignment
Form 11Accident reportAfter an accident is reported by phone or e-mail

The BRSR's hazardous waste figure (Principle 6) should agree with Form 4, and Form 4 with the Form 10 manifests. Non-compliance is a contravention of rules under the Environment (Protection) Act, with the penalties above22.

What the annual return looks like. Form 4, redrawn and filled in for the same plant. A generator fills in the header and Part A; Parts B and C are for treatment facilities and recyclers.

Form walkthrough

Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016 — rules 6(5), 13(8), 16(6) and 20(2). Submit to the State Pollution Control Board by 30 June.

Form 4 — Form for filing annual returns (April 2025 to March 2026)

The facility

1 Name and address of the facility

Konkan Organics Ltd, Plot D-12, MIDC Lote Parshuram, Ratnagiri, Maharashtra

As on the authorisation.

2 Authorisation number and date of issue

The number on the Form 2 authorisation; issued 1 April 2023, valid to 31 March 2028

From Form 2. Check the expiry: a renewal application is due three months before it.

Watch out: Quoting an authorisation that has expired. Operating on it is itself a contravention.

3 Name of the authorised person, with full address, telephone and e-mail

R. Desai, Plant Head — address as above; the plant's phone and e-mail

The occupier or the person the Board deals with.

4 Production during the year, product-wise

Ethyl acetate: 27,600 tonnes

Actual production, from the production records.

Part A — To be filled in by hazardous waste generators

1 Total quantity of waste generated, category-wise

Waste (category as in the authorisation)Quantity generated
Distillation residue418.0 t
ETP sludge20.0 t
Total438.0 t

Each waste category as listed in your authorisation, with its Schedule I category number. Totals from the Form 3 records.

Watch out: Lumping categories together, or reporting a waste the authorisation does not cover.

2 Quantity dispatched: (i) to a disposal facility, (ii) to a recycler, co-processor or pre-processor, (iii) others

(i) 20.0 t to the common TSDF; (ii) 402.0 t to cement-kiln co-processing; (iii) nil

Add up the Form 10 manifests for the year, by receiver. Each receiver must be authorised for that waste.

Watch out: Dispatch figures that do not match the manifests, or a receiver without a valid authorisation.

3 Quantity utilised in-house, if any

Nil

Only if the authorisation allows in-house use.

4 Quantity in storage at the end of the year

16.0 t

Physical stock on 31 March. Check: 438.0 generated = 20.0 + 402.0 + 0 used + 16.0 in store (no opening stock). If there was stock at the start of the year, explain it.

Watch out: A balance that does not close. Storage limits and periods in the authorisation also apply.

Signature

Signature of the occupier, with date and place

R. Desai, Plant Head — 24 June 2026, Lote

Signed by the occupier. Keep the acknowledgement of submission.

Redrawn from Form 4 as published by the Puducherry Pollution Control Committee32; due date and forms as summarised by the Tamil Nadu Pollution Control Board24. The entries are an illustrative example. Check the current form with the authority before you file. Form 4 (hazardous waste): due date, penalty and questions.

Extended producer responsibility (Principle 2)

Producers, importers and brand owners of plastic packaging, and producers of batteries, electronics and tyres, have extended producer responsibility (EPR) targets: they must ensure a share of what they place on the market is collected and recycled, and buy EPR certificates from registered processors to show it. Principle 2 of the BRSR asks whether EPR applies to the company and whether its waste collection plan is in line with the plan submitted to the Pollution Control Boards10.

  • Plastic packaging. Producers, importers and brand owners register on the CPCB's centralised EPR portal (Form I) and meet targets for recycling and, increasingly, recycled content — for rigid plastic packaging (category I), 30% recycled content from FY 2025-26 rising to 60% from FY 2028-2926. Annual returns are filed on the portal. In March 2026 the CPCB issued show-cause notices to producers that had not filed annual returns for FY 2022-23, and in June 2026 it directed State Boards to impose environmental compensation and revoke registrations of non-compliant processors27.
  • Batteries. Producers file a quarterly return within 30 days of the quarter's end and an annual return by 30 June. If the annual return is not filed in time, the portal levies environmental compensation automatically ("Return not filed"); a shortfall in a metal's recycling target is added to the next year's target28.
  • E-waste and tyres work through the same CPCB portal model. Take the current due dates from the portal and the rules, which are amended often.

Since January 2025, failures under the plastic rules are penalised under section 15 of the Environment (Protection) Act26.

Energy and carbon: PAT and CCTS (Principle 6)

Plants notified as designated consumers under the Energy Conservation Act report energy use to the Bureau of Energy Efficiency (BEE) every year in Form 1, by 30 June, under the Perform, Achieve and Trade (PAT) scheme; missing the verification timelines can bring a penalty of ₹10 lakh plus ₹10,000 a day29. Obligated entities under India's Carbon Credit Trading Scheme submit a monitoring plan, and a verified greenhouse gas emission report and Form A within four months of the end of the compliance year30. The greenhouse gas accounting course takes both schemes step by step. The BRSR's energy and Scope 1 and 2 figures for the same plants should reconcile with these filings — the boundaries and methods differ in places, so explain the differences.

People: POSH and the labour codes (Principles 3 and 5)

Sexual harassment. Under the Sexual Harassment of Women at Workplace (Prevention, Prohibition and Redressal) Act, 201325:

  • every workplace with 10 or more workers must constitute an Internal Committee; complaints from smaller workplaces go to the Local Committee;
  • the Internal Committee prepares an annual report each calendar year and submits it to the employer and the District Officer (section 21);
  • the employer includes the number of cases filed and their disposal in its annual report (section 22);
  • failing to constitute the committee or to comply with the Act is punishable with a fine of up to ₹50,000; a repeat can mean twice the punishment and cancellation of the business licence or registration (section 26).

What the Internal Committee's annual report contains. The Rules list five items. Here they are filled in for the Lote plant's committee for calendar year 2025.

Form walkthrough

Sexual Harassment of Women at Workplace (Prevention, Prohibition and Redressal) Act, 2013, section 21, and Rules, 2013, rule 14. To the employer and the District Officer.

Annual report of the Internal Committee, calendar year 2025

The report

(a) Number of complaints of sexual harassment received in the year

3

Complaints filed with the committee in the calendar year, whatever their outcome.

Watch out: Counting only upheld complaints.

(b) Number of complaints disposed of during the year

3

Inquiries concluded in the year.

(c) Number of cases pending for more than ninety days

0

The Act expects an inquiry to finish within 90 days; any case older than that is listed here.

Watch out: A pending case with no explanation.

(d) Number of workshops or awareness programmes against sexual harassment carried out

4

Sessions held, with dates and attendance on file.

(e) Nature of action taken by the employer or District Officer

One written warning with an increment withheld; one transfer of the respondent with a written apology; one complaint not proved after inquiry

The kind of action — never names. The identity of the parties is confidential under the Act.

Watch out: Naming the people involved, in this report or in the BRSR.

Items as listed in rule 14 of the Rules25. The entries are an illustrative example. Check the current form with the authority before you file. POSH annual report: due date, penalty and questions.

For the BRSR, the committee's figures are re-cut to the financial year: complaints filed, pending at year-end and resolved, by month10.

The BRSR's Principle 5 asks for the number of sexual harassment complaints filed, pending and resolved10. The Internal Committee's report is for the calendar year; the BRSR is for the financial year. Reconcile by month, not by copying the annual total.

The labour codes. The four labour codes — on wages, industrial relations, social security, and occupational safety, health and working conditions — came into force on 21 November 2025, consolidating 29 labour laws13. Registers, returns and their due dates are set by the central and state rules under the codes. Take them from your labour compliance team's current calendar, not from a list built on the repealed Acts. The BRSR's Principle 3 figures — provident fund, ESI and gratuity coverage, wages, safety incidents — should agree with the payroll and with these returns.

The cross-check table

BRSR itemGovernment filing to reconcile with
Section A item 22 (CSR) and Principle 8Board's report CSR annexure; Form CSR-2; Unspent CSR Account statement
Principle 6: water, waste, air emissionsForm V (by 30 September); HW Form 4 (by 30 June); consent conditions and monitoring reports
Principle 6: energy, Scope 1 and 2PAT Form 1; CCTS monitoring plan and verified emission report
Principle 2: EPRCPCB EPR portal registration, certificates and annual returns
Principle 5: sexual harassment complaintsInternal Committee annual report (calendar year)
Principle 3: benefits, wages, safetyPayroll; returns under the labour codes
Principle 1: fines and penaltiesExchange notices; SEBI, SPCB, CPCB and MCA orders

Practice

Exercise 1: Reconcile the BRSR with the government filings

Konkan Organics Ltd's draft BRSR for FY 2025-26 shows hazardous waste of 412 tonnes and 2 sexual harassment complaints. Its HW Form 4 for the same year shows 438 tonnes, and so does its Form V. The Internal Committee's report for calendar year 2025 shows 3 complaints. What do you do?

Show the model answer
  • Hazardous waste. Two statutory filings agree on 438 t; the BRSR's 412 t is probably wrong. Trace the difference — 26 t — through the Form 3 records and the Form 10 manifests24. Common causes: one site's waste missed in the BRSR data request, or waste stored at year-end but not yet sent. Correct the BRSR unless the investigation shows the statutory filings were wrong, in which case the company must also correct them with the SPCB.
  • Complaints. The periods differ: the Internal Committee reports by calendar year, the BRSR by financial year2510. Ask the committee for complaints by month and count April 2025 to March 2026. Three complaints in calendar 2025 and two in FY 2025-26 can both be right — but check, and show filed, pending and resolved separately.

Exercise 2: The CSR year-end

Konkan Organics' CSR obligation for FY 2025-26 was ₹3.6 crore. It spent ₹2.9 crore. Of the ₹0.7 crore unspent, ₹0.5 crore is for a school building that is an ongoing project; ₹0.2 crore is not linked to any ongoing project. What must it do, by when, and what is the exposure if it does nothing?

Show the model answer
  • ₹0.5 crore (ongoing project) — transfer to the Unspent CSR Account by 30 April 2026 (30 days after year-end), and spend it within three financial years20.
  • ₹0.2 crore (not ongoing) — transfer to a Schedule VII fund by 30 September 2026 (six months after year-end)18.
  • If it does nothing: the amount required to be transferred is ₹0.7 crore. The company's penalty is twice that (₹1.4 crore) or ₹1 crore, whichever is less — ₹1 crore. Each officer in default: one-tenth (₹7 lakh) or ₹2 lakh, whichever is less — ₹2 lakh each2018.
  • Reporting: the CSR annexure in the board's report shows the unspent amounts and the transfers17; Form CSR-2 is filed after AOC-419; and the BRSR shows the CSR spend consistent with both.

Check your understanding

Choose an answer to see if you are right.

By when must a unit that holds a consent under the Water Act submit its Environmental Statement (Form V) for the year ending 31 March?

Show the answer

B. 30 September Rule 14 of the Environment (Protection) Rules requires Form V to be submitted to the State Pollution Control Board by 30 September.

Sources for this lesson

  1. Guidance note for the Business Responsibility and Sustainability Report (Annexure II to the circular of 10 May 2021) — SEBI. 10 May 2021; checked November 2026
  2. New labour codes implemented across the country effective 21 November 2025 — EY India. November 2025; checked November 2026
  3. Companies (Corporate Social Responsibility Policy) Amendment Rules, 2021: summary — ICAI (Navi Mumbai branch). January 2021; checked November 2026
  4. Corporate social responsibility under the Companies Act, 2013 (presentation) — Institute of Company Secretaries of India. checked November 2026
  5. Companies (Accounts) Second Amendment Rules, 2023 (G.S.R. 408(E)): Form CSR-2 filed separately — Gazette of India. 31 May 2023; checked November 2026
  6. ROC penalises company and officers for not transferring unspent CSR amount (section 135(6) and (7)) — Taxmann. 19 September 2023; checked November 2026
  7. The Environment (Protection) Rules, 1986 (rule 14: environmental statement in Form V) — Ministry of Environment, Forest and Climate Change. as amended; checked November 2026
  8. Jan Vishwas (Amendment of Provisions) Bill, 2022, as passed by Lok Sabha: amendments to the Environment (Protection) Act and the Air Act — PRS Legislative Research. July 2023; checked November 2026
  9. The Water (Prevention and Control of Pollution) Amendment Act, 2024 — Gazette of India. 15 February 2024; checked November 2026
  10. Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016: forms and timelines — Tamil Nadu Pollution Control Board. checked November 2026
  11. The Sexual Harassment of Women at Workplace (Prevention, Prohibition and Redressal) Act, 2013, and Rules — Government of India (copy published by Delhi Police). checked November 2026
  12. An overview of extended producer responsibility for plastic waste management — Chambers and Partners. 2026; checked November 2026
  13. CPCB compliance status in O.A. No. 993 of 2024 (plastic packaging EPR) — National Green Tribunal (filing by CPCB). 6 July 2026; checked November 2026
  14. EPR guidance manual for producers under the Battery Waste Management Rules, 2022 — Punjab Pollution Control Board. checked November 2026
  15. PAT Rules and obligations of designated consumers under the PAT scheme — Bureau of Energy Efficiency. checked November 2026
  16. Detailed procedure for the compliance mechanism under the Carbon Credit Trading Scheme — Bureau of Energy Efficiency (copy published by DevelopmentAid). 2025; checked November 2026
  17. Environmental statements: Form V (see rule 14) — Odisha State Pollution Control Board. checked November 2026
  18. Form 4: Form for filing annual returns (Hazardous and Other Wastes Rules, 2016) — Puducherry Pollution Control Committee. checked November 2026
  19. e-Form CSR-2: report on corporate social responsibility (presentation) — Institute of Company Secretaries of India. 2022; checked November 2026

Completing every lesson opens the exam and the certificate. Sign in with your e-mail to record your progress — no password and no account.

More: BRSR practice questions · notes (PDF) · ESG glossary